PLM06-02677
| Sprinkler (Final) | 8/11/2006 | 8/11/2006 | 8/11/2006 4:15:47 PM | P | PASS |
|
|
|
PLM06-02699
| Plumbing Rough-in | 8/11/2006 | 8/11/2006 | 8/11/2006 3:30:27 PM | P | PASS |
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PLM06-02724
| Water and/or Sewer | 8/11/2006 | 8/11/2006 | 8/11/2006 3:10:14 PM | P | PASS |
|
|
travis; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02724
| DOC - Permit Finaled | 8/11/2006 | 8/11/2006 | 8/11/2006 3:10:03 PM | P | PASS |
|
|
travis; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02726
| Groundwork | 8/11/2006 | 8/11/2006 | 8/11/2006 2:51:13 PM | P | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PLM05-04309
| Plumbing Rough-in | 8/10/2006 | 8/11/2006 | 8/11/2006 2:33:53 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/10/2006 at 4:32:14 PM. Contact: ###-####. third floor roof and over-flow drains vent,s for four room on west side of building test ok
|
PLM06-02695
| Plumbing Rough-in | 8/11/2006 | 8/11/2006 | 8/11/2006 1:24:39 PM | P | PART |
|
|
harold - partial on storm drains; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley strom drain from buidingto pit test ok still need to make tie -in,s at building
|
PLM06-02684
| Water and/or Sewer | 8/10/2006 | 8/11/2006 | 8/11/2006 12:05:52 PM | A | PART |
|
|
swr line ###-####- for one of the 28 swr lines ten sewer line extension from west boise sewer line easement to lot property line,s from west side to east portion of subdivision test ok
|
PLM06-02706
| Water and/or Sewer | 8/10/2006 | 8/11/2006 | 8/11/2006 10:15:29 AM | A | PART |
|
|
Jesse is the maint. supervisor to contact. Thank you; Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom rough-in for washing machine test ok need to provide protective covering on exposed piping in women restroom next to washing machine location where drain and water tie -in,s was made. note - if dryer vent to be made by plumbing contractor need to pull a mechanical permit and have inspected by mechanical inspector
|