BLD07-00007
| BLD-Final | 8/11/2008 | 8/11/2008 | 8/13/2008 8:49:03 AM | P | PART |
|
|
brian Phone #: ###-#### ok to use to west side of bldg fire has oking fire watch exiting is all in place
|
BLD08-01174
| BLD-Final | 8/8/2008 | 8/11/2008 | 8/12/2008 8:02:27 AM | P | PASS |
|
|
Drew Phone #: ###-####
|
BLD06-02303
| BLD-Concrete | 8/11/2008 | 8/11/2008 | 8/11/2008 3:04:31 PM | P | PART |
|
|
Brad Phone #: ###-#### mti on site to cover that concrete placement of the 18 th floor
|
BLD06-02303
| BLD-Framing/Rough-in | 8/11/2008 | 8/11/2008 | 8/11/2008 3:03:30 PM | P | PART |
|
|
Brad Phone #: ###-#### 6th floor ok to cover walls in condos
|
BLD08-01595
| BLD-Framing/Rough-in | 8/11/2008 | 8/11/2008 | 8/11/2008 3:02:41 PM | P | PART |
|
|
Von Phone #: ###-#### looked at top mounted hangeds all ok
|
BLD08-01101
| BLD-Framing/Rough-in | 8/11/2008 | 8/11/2008 | 8/11/2008 3:01:56 PM | P | PART |
|
|
kevin Phone #: ###-#### talked to super about how to do phased projects
|
BLD07-01692
| BLD-Wall cover | 8/11/2008 | 8/11/2008 | 8/11/2008 1:21:41 PM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover awalls need new fire life safty plan
|
BLD08-01676
| BLD-Framing/Rough-in | 8/11/2008 | 8/11/2008 | 8/11/2008 1:20:43 PM | P | PASS |
|
|
Robert Phone #: ###-#### ok to cover after elec r/i
|
BLD07-00007
| BLD-Final | 8/8/2008 | 8/11/2008 | 8/11/2008 10:31:51 AM | A | PART |
|
|
brian Phone #: ###-#### stell need fires ok talked with tom A about project he has done several walks with brian most everything is in good shape
|
BLD08-01444
| BLD-Energy code compliance | 8/8/2008 | 8/11/2008 | 8/11/2008 8:52:28 AM | A | PASS |
|
|
Ron- call 30 min prior to going Phone #: ###-####
|
BLD08-00379
| BLD-Aging Inspection | 8/11/2008 | 8/11/2008 | 8/11/2008 8:43:15 AM | | PASS |
|
|
wip
|
BLD07-02763
| BLD-Aging Inspection | 8/11/2008 | 8/11/2008 | 8/11/2008 8:42:12 AM | | PASS |
|
|
exps on 10/18/08
|