Inspections for the day of: Monday, August 11, 2008.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01487 General Inspection8/11/20088/11/20088/11/2008 4:09:48 PMPPASS
No issues present. All BMPs look good.
ESC08-00445 Tracking Control8/6/20088/11/20088/11/2008 3:31:24 PMPPASS
Cleaning up on a daily basis, or when needed.
CAS
ESC08-00369 Random Inspection8/11/20088/11/20088/11/2008 3:30:31 PMPPASS
Site kept clean. No issues present.
CAS
ESC08-00486 General Inspection8/11/20088/11/20088/11/2008 3:10:57 PMPPASS
No issues present.
ESC08-00006 Random Inspection8/11/20088/11/20088/11/2008 3:01:42 PMPPASS
Site is kept clean nad bmp's are in good shape. Notice of correction removed.
CAS
ESC08-00497 Random Inspection8/11/20088/11/20088/11/2008 1:44:36 PMPPASS
ESC08-00248 Site Preparation8/11/20088/11/20088/11/2008 1:14:29 PMPPASS
ESC08-00495 Random Inspection8/11/20088/11/20088/11/2008 11:18:19 AMAFAIL
Need to re-inspall perimeter protection. (wattle) will re-inspect on 8/15/08.
CAS
ESC08-00069 Tracking Control8/11/20088/11/20088/11/2008 10:07:38 AMAPASS
Entrance installed correctly. No other issues on site. Site looks good.
CAS
ESC08-00066 Tracking Control8/11/20088/11/20088/11/2008 10:06:51 AMAPASS
Entrance installed correctly. No other issues on site. Site looks good.
CAS
ESC04-01335 Site Final8/11/20088/11/20088/11/2008 9:51:13 AMPPASS
ESC07-01173 Site Final8/11/20088/11/20088/11/2008 9:50:47 AMPPASS
Final landscaping completed.
ESC08-00490 BMP Violation8/6/20088/11/20088/11/2008 9:41:39 AMAPASS
Drains protected with proper inserts.
CAS
ESC06-00221 Site Final8/11/20088/11/20088/11/2008 9:04:01 AMAPASS
All work is completed.
CAS
ESC08-00464 Site Preparation8/11/20088/11/20088/11/2008 9:00:26 AMAPASS
Site looks good. All step have been taken for pervention.
CAS
ESC07-01520 Tracking Control8/8/20088/11/20088/11/2008 8:53:09 AMAPASS
All issues with notice were corrected.
CAS
ESC08-00497 Site Preparation8/11/20088/11/20088/11/2008 8:45:48 AMPDEFR
Moved to a random inspection.
CAS
ESC08-00183 BMP Violation8/11/20088/11/20088/11/2008 8:36:03 AMAPART
Due to the phase of work, the site is in the process of paving and will not installing a construction entrance. Will re-inspect on 8/25/08.
CAS