BLD05-00867
| FIRE-Final Inspection | 8/7/2009 | 8/11/2009 | 8/12/2009 4:06:59 PM | P | FAIL |
|
|
All items except for the racking permit have been corrected. Jay is following up on getting the permit going.
|
FIR09-00424
| INSP-Sprinkler Rough-in/Hydro | 8/11/2009 | 8/11/2009 | 8/11/2009 3:59:43 PM | P | PASS |
|
|
The overhead hydro test of the new pre-action system passed.
|
FIR09-00033
| INSP-Sprinkler Rough-in/Hydro | 8/4/2009 | 8/11/2009 | 8/11/2009 3:59:04 PM | A | PASS |
|
|
Rough-in inspections for sprinkler systems 16, 17, 18 and 25 are passed. There are some the the typical 4x4 beam obstructions on system 25 that will need addressed. Also we started the rough-in inspection on system 24 but found beams blocking the upright sprinkler heads in the areas under the roof penthouses. I spoke to Jeff Packham on the phone about these obstructions and he stated he would be out in the afternoon to investigate.
|
FIR09-00447
| INSP-Final Inspection | 8/11/2009 | 8/11/2009 | 8/11/2009 11:59:28 AM | P | CANC |
|
|
Please call as soon as possible, to schedule. Thank you. Jason ###-#### Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|