BLD08-01918
| BLD-Aging Inspection | 8/11/2010 | 8/11/2010 | 8/19/2010 10:59:17 AM | | CANC |
|
|
|
BLD10-01046
| BLD-Final | 8/11/2010 | 8/11/2010 | 8/11/2010 4:01:11 PM | P | NR |
|
|
Tim Phone #: ###-####. Needs electrical final inspection first. Tim was notified via phone call.
|
BLD10-01207
| BLD-Framing/Rough-in | 8/11/2010 | 8/11/2010 | 8/11/2010 2:21:59 PM | P | PASS |
|
|
Interior steel stud framed walls and hardlid only. Contractor now has the required 90 minute door frames for the 2hr. fire barrier wall. Also verified class C smoke and flame spread for kraft paper.
|
BLD10-01761
| BLD-Final | 8/10/2010 | 8/11/2010 | 8/11/2010 1:29:55 PM | P | PASS |
|
|
karen - please call 1/2 hr prior Phone #: ###-####. ok for perm. occupancy.
|
MIS10-00231
| BLD-Conference | 8/11/2010 | 8/11/2010 | 8/11/2010 11:54:43 AM | A | FAIL |
|
|
Complaint of working w/out permits. Permit required for work being done. Stop work issued. Needs to submit plans and get all required inspections to obtain certificate of occupancy.
|
ESC10-00012
| General Inspection | 8/11/2010 | 8/11/2010 | 8/11/2010 11:53:04 AM | A | PASS |
|
|
|
BLD10-01207
| BLD-Framing/Rough-in | 8/11/2010 | 8/11/2010 | 8/11/2010 11:50:40 AM | A | CANC |
|
|
|
BLD09-02146
| BLD-Framing/Rough-in | 8/10/2010 | 8/11/2010 | 8/11/2010 11:35:53 AM | A | FAIL |
|
|
Wendell Phone #: ###-####. Needs to provide remainder of truss engineering, complete bracing on gable end truss and get site built trusses approved by plan review. ok to insulate. Correction notice issued.
|
BLD10-01291
| BLD-Footing | 8/10/2010 | 8/11/2010 | 8/11/2010 10:40:30 AM | A | PART |
|
|
Cal Phone #: ###-####. Work in progress on installing vertical reinforcement.
|
ESC10-00483
| Site Preparation | 8/11/2010 | 8/11/2010 | 8/11/2010 10:39:41 AM | A | PART |
|
|
ESC permit sign is posted, conc washout is provided, noted to RP to monitor washout, it is getting full, also needs to provide sediment barrier along east west and south property lines, Verbal correction notice given to RP.
|