BLD11-01067
| BLD-Framing/Rough-in | 8/11/2011 | 8/11/2011 | 8/12/2011 6:31:29 AM | P | PASS |
|
|
Rich Park Phone #: ###-#### ok to cover after elec r/i is oked
|
BLD11-01292
| BLD-Energy code compliance | 8/11/2011 | 8/11/2011 | 8/12/2011 6:30:47 AM | P | FAIL |
|
|
Kevin Phone #: ###-#### insulation ok but 7x7 post for 4ply support in livingroom not instailled
|
BLD11-01822
| BLD-Framing/Rough-in | 8/10/2011 | 8/11/2011 | 8/12/2011 6:27:34 AM | P | PART |
|
|
dylan Phone #: ###-#### ok to insulate but need to open up wall on first floor to find out if there is and what size of header is over windows on west side
|
BLD11-01672
| BLD-Framing/Rough-in | 8/11/2011 | 8/11/2011 | 8/11/2011 2:33:59 PM | P | PASS |
|
|
gary Phone #: ###-####
|
BLD09-00587
| BLD-Other | 8/11/2011 | 8/11/2011 | 8/11/2011 11:18:51 AM | P | PASS |
|
|
BOB Phone #: ###-#### everthing ok gate to the top of the tower is temperary at time of insection it was sealed off and locked up.
|
BLD09-00587
| DOC - Permit Finaled | 8/11/2011 | 8/11/2011 | 8/11/2011 11:15:24 AM | P | PASS |
|
|
|
BLD11-01128
| BLD-Framing/Rough-in | 8/10/2011 | 8/11/2011 | 8/11/2011 10:55:06 AM | A | PASS |
|
|
ceiling grid inspection Phone #: ###-#### >> Inspection requested via web by Danton Walker
|
BLD09-01143
| BLD-Final | 8/11/2011 | 8/11/2011 | 8/11/2011 10:54:32 AM | P | PASS |
|
|
|
BLD09-01143
| DOC - Permit Finaled | 8/11/2011 | 8/11/2011 | 8/11/2011 10:54:14 AM | P | PASS |
|
|
|
BLD11-00477
| BLD-Energy code compliance | 8/10/2011 | 8/11/2011 | 8/11/2011 9:53:38 AM | A | PART |
|
|
mike Phone #: ###-#### ok to cover int but still needs can lights in sofits protected also crew on site double rocking sofits as thry cover
|
GCB11-00042
| GCB-Energy | 8/10/2011 | 8/11/2011 | 8/11/2011 9:25:15 AM | A | PASS |
|
|
EnergyBill @ ###-####
|