BLD11-01030
| FIRE-Final Inspection | 8/11/2011 | 8/11/2011 | 8/11/2011 4:14:18 PM | P | FAIL |
|
|
Project was not ready for a final inspection due to the project related fire sprinkler permit not being able to be finaled.
|
FIR11-00095
| INSP-Sprinkler Rough-in | 8/10/2011 | 8/11/2011 | 8/11/2011 4:13:19 PM | A | PASS |
|
|
The piping at the second floor, over the lobby stairs, is ok to cover.
|
FIR11-00375
| INSP-Final Inspection | 8/10/2011 | 8/11/2011 | 8/11/2011 2:09:35 PM | A | FAIL |
|
|
There is a draft stop, leftover wall top, that is blocking upright sprinkler coverage. This obstruction was not shown on the plans. The upright coverage off of the wall is around 163 sq. ft. Per the hydraulic calculations and the existing upright sprinkler spacing 120 sq. ft. is the max.
|
FIR11-00398
| INSP-Final Inspection | 8/10/2011 | 8/11/2011 | 8/11/2011 1:18:56 PM | A | PASS |
|
|
Permit finaled
|
FIR11-00302
| INSP-Final Inspection | 8/9/2011 | 8/11/2011 | 8/11/2011 12:00:49 PM | A | FAIL |
|
|
HVAC units 213 and 214 did not shut down immediately upon detection of smoke. All other devices tested ok.
|