FIR12-00717
| INSP-Sprinkler Rough-in | 8/11/2014 | 8/11/2014 | 8/11/2014 3:24:30 PM | P | PASS |
|
|
Two small rooms, as marked on the plans, at the new canopy, are of for cover.
|
FIR14-00462
| INSP-Sprinkler Rough-in | 8/11/2014 | 8/11/2014 | 8/11/2014 2:53:08 PM | P | PASS |
|
|
Underground supply piping is ok for cover.
|
FIR14-00466
| INSP-Sprinkler Rough-in | 8/11/2014 | 8/11/2014 | 8/11/2014 2:52:41 PM | P | PASS |
|
|
Underground supply piping is ok for cover
|
BLD14-01686
| FIRE-Final Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 9:59:33 AM | P | PASS |
|
|
life safety passed
|
BLD14-01685
| FIRE-Final Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 9:59:10 AM | P | PASS |
|
|
life safety passed
|
NAF14-00005
| INSP-Sprinkler Rough-in | 8/8/2014 | 8/11/2014 | 8/11/2014 8:55:04 AM | A | PASS |
|
|
1st floor branch line restraints have been installed. Piping is ok to cover.
|