Inspections for the day of: Tuesday, August 11, 2015.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00695 DOC - Permit Finaled8/11/20158/11/20158/11/2015 4:34:27 PMPPASS
GCB14-00099 GCB-Framing8/11/20158/11/20158/11/2015 4:34:09 PMPCANC
Gary ###-#### - 3rd floor S. wing
BLD15-00696 DOC - Permit Finaled8/11/20158/11/20158/11/2015 4:23:09 PMPPASS
BLD14-03396 DOC - Permit Finaled8/11/20158/11/20158/11/2015 3:09:18 PMPPASS
GCB14-00096 GCB-Framing8/10/20158/11/20158/11/2015 3:03:08 PMPPASS
Dan ###-####
BLD14-03068 BLD-Final8/5/20158/11/20158/11/2015 2:57:06 PMPPASS
Phone #: ###-#### Inspection requested via web by sheila fawley
BLD14-03068 DOC - Permit Finaled8/11/20158/11/20158/11/2015 2:56:48 PMPPASS
GCB15-00029 GCB-Shearwall8/10/20158/11/20158/11/2015 2:56:25 PMPPART
Nick ###-####
Insp of three brace panels at North wall ......including Hold downs, Titen Screws and nailing...OK. As per Engineers direction, I observed new raked shear wall locacted at center of building above CMU wall. Wall sheathed and nailed at 6/12. Also glue lam block , 4 hold downs (mounted horizontally) with threaded rod and nuts completed to tie the beam from North building (East side) to South building. Approx 40 foot strap installed to connect beam at North bldg to South bldg. Strap nailed into 2x8 ....full length.
BLD15-01712 BLD-Final8/11/20158/11/20158/11/2015 1:26:06 PMPPASS
Windows // Gary Phone #: ###-####
BLD15-01712 DOC - Permit Finaled8/11/20158/11/20158/11/2015 1:25:32 PMPPASS
BLD14-03445 DOC - Permit Finaled8/11/20158/11/20158/11/2015 1:06:56 PMPPASS
BLD14-02918 BLD-Final8/5/20158/11/20158/11/2015 12:35:19 PMPPASS
Phone #: ###-#### Inspection requested via web by sheila fawley
BLD14-02918 DOC - Permit Finaled8/11/20158/11/20158/11/2015 12:35:02 PMPPASS
BLD15-00581 BLD-Footing8/10/20158/11/20158/11/2015 12:09:21 PMPPASS
Andy Phone #: ###-####
BLD15-02753 BLD-Framing/Rough-in8/11/20158/11/20158/11/2015 12:07:49 PMPPASS
BLD15-00935 BLD-Wall Bracing8/10/20158/11/20158/11/2015 12:07:24 PMAPASS
Sergey Phone #: ###-####
BLD15-00824 BLD-Conference8/10/20158/11/20158/11/2015 12:06:56 PMADONE
Phone #: ###-#### Inspection requested via web by Jon Yorgason
BLD15-02753 BLD-Framing/Rough-in8/10/20158/11/20158/11/2015 12:05:27 PMACANC
MId morning, after ELE - Perry Phone #: ###-####
MIS15-00204 BLD-Conference8/10/20158/11/20158/11/2015 9:54:09 AMADONE
Working on the roof without permit
Sonic Roofing Double fee. Roof approx 1/2 complete.