FIR14-00783
| INSP-Final Inspection | 8/11/2015 | 8/11/2015 | 8/11/2015 3:48:30 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00839
| INSP-Sprinkler Rough-in | 8/11/2015 | 8/11/2015 | 8/11/2015 3:44:24 PM | P | DONE |
|
|
Boise Fire Dept. witnessed the flowing water at the foam generators. Forrest France verified required pressure at foam generator.
|
BLD15-01247
| FIRE-Final Inspection | 8/11/2015 | 8/11/2015 | 8/11/2015 3:42:13 PM | P | CANC |
|
|
Overbooked. Rescheduled for tomorrow morning. Kelly Phone #: ###-####
|
FIR14-00928
| INSP-Alarm Testing | 8/10/2015 | 8/11/2015 | 8/11/2015 2:53:17 PM | A | DONE |
|
|
Todays testing included all tamper switches except Fire Pump #1 intake (needs replaced) and all flow and pressure switches. The hose valve tampers/riser are labeled incorrectly. Also tested the fire pump interconnection to the FACP. Risers and fire pumps need labeling to match the FACP display. Need signal reports. Need plans resubmitted due to extensive changes which include using a 4009 NAC panel for releasing and a wireless dialer instead of phone lines and door mags that need releasing upon flow of water.
|
FIR15-00543
| INSP-Final Inspection | 8/10/2015 | 8/11/2015 | 8/11/2015 2:09:17 PM | P | CANC |
|
|
wrong permit called in.
|
FIR15-00143
| INSP-Supply line flush | 8/11/2015 | 8/11/2015 | 8/11/2015 2:01:17 PM | P | PASS |
|
|
Underground flush passed
|
FIR14-00746
| INSP-Final Inspection | 8/11/2015 | 8/11/2015 | 8/11/2015 1:58:43 PM | P | PASS |
|
|
permit finaled
|
FIR14-00746
| INSP-Supply line flush | 8/11/2015 | 8/11/2015 | 8/11/2015 1:55:58 PM | P | PASS |
|
|
Underground flush passed
|
BLD15-02359
| FIRE-Final Inspection | 8/11/2015 | 8/11/2015 | 8/11/2015 11:34:12 AM | P | PASS |
|
|
Life safety passed
|
BLD15-01248
| FIRE-Final Inspection | 8/10/2015 | 8/11/2015 | 8/11/2015 10:39:14 AM | A | PASS |
|
|
life safety passed
|
FIR15-00494
| INSP-Final Inspection | 8/7/2015 | 8/11/2015 | 8/11/2015 10:37:11 AM | A | PASS |
|
|
The walls for offices ws-1, ws-2 and ws-3 are low walls so the 15cd strobe was overspaced. The 15cd wall mount was changed to 110cd and EOL verifed. Lee will need as-builts. Permit finaled
|
BLD15-02287
| FIRE-Final Inspection | 8/10/2015 | 8/11/2015 | 8/11/2015 10:34:38 AM | A | FAIL |
|
|
Life safety will be ok to pass when the fire alarm and fire sprinkler corrections/permits have been made.
|
FIR15-00447
| INSP-Final Inspection | 8/10/2015 | 8/11/2015 | 8/11/2015 7:04:18 AM | A | PASS |
|
|
Permit finaled
|