Inspections for the day of: Monday, August 12, 1996.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD95-02164 INSP - Conference8/12/19968/12/19968/12/1996 12:00:00 AM PASS
/ / 342 - met w/Joel ref: cover of even small pours
BLD96-01472 INSP - Framing/Rough-in8/12/19968/12/19968/12/1996 12:00:00 AM PART
/ / 342 - redo truss fix rear of bldg..call when ready...ok to cover r
BLD96-01070 INSP - Conference8/12/19968/12/19968/12/1996 12:00:00 AM PASS
/ / 342 - discussed stair gwb and handrail requirement
BLD96-01981 INSP - Final8/12/19968/12/19968/12/1996 12:00:00 AM PASS
/ / 342 -
BLD96-01981 INSP - Framing/Rough-in8/9/19968/12/19968/12/1996 12:00:00 AMAPASS
08/12/96 342 -
BLD96-01663 INSP - Conference8/12/19968/12/19968/12/1996 12:00:00 AMPPART
08/12/96 342 - 3 P.M.
BLD96-01875 INSP - Footings8/12/19968/12/19968/12/1996 12:00:00 AMPPASS
08/12/96 342 -
BLD95-02121 INSP - Footings8/12/19968/12/19968/12/1996 12:00:00 AMPNH
08/12/96 342 - LATE P.M.
BLD95-02164 INSP - Flatwork8/12/19968/12/19968/12/1996 12:00:00 AMPPART
08/12/96 342 - 1:30 p.m. pads trammels
BLD96-00252 INSP - Footings8/9/19968/12/19968/11/1996 12:00:00 AMANR
08/12/96 342 -
BLD96-01010 INSP - Conference8/9/19968/12/19968/11/1996 12:00:00 AMAPART
08/12/96 342 -
BLD96-01913 INSP - Footings8/9/19968/12/19968/11/1996 12:00:00 AMAPASS
08/12/96 342 -
BLD96-01914 INSP - Site Preparation8/9/19968/12/19968/11/1996 12:00:00 AMAPART
08/12/96 342 - CHECK OUT THE SOIL. ESTRADA ENGR.WILL BE ON THIS JOB. MO
BLD96-01472 INSP - Energy code compliance8/9/19968/12/19968/11/1996 12:00:00 AMAPASS
08/12/96 342 -