PLM02-01179
| Plumbing Rough-in | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 07:32:42. Contact: ###-####.
|
PLM02-02478
| Water and/or Sewer | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PART |
|
|
JOHN ###-#### sewer stub to the addition is ok but the water has a copper to poly joint under the slab and the adaptor was soldered instead of brazed, ok to cover sewer and only the water by the meter , the poly/copper under the slab needs to be reinspected. 8/12/2002 1:54:53 PM
|