Inspections for the day of: Monday, August 12, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01768 BLD-Final8/5/20028/12/20028/12/2002 12:00:00 AMANR
###-#### BARTneeds ele prior. 8/12/2002 10:20:07 AM
BLD02-01802 BLD-Footing8/8/20028/12/20028/12/2002 12:00:00 AMAPASS
BOB ; Phone #: ###-####
BLD02-01246 BLD-Wall cover8/9/20028/12/20028/12/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/09/2002 at 08:48:18. Contact: ###-####.c/n posted. 8/12/2002 11:05:48 AM
BLD01-02615 BLD-Final8/9/20028/12/20028/12/2002 12:00:00 AMAPART
###-#### DOUG job has been completed and appears ok. 8/12/2002 11:12:44 AM
BLD02-01087 BLD-Framing/Rough-in8/9/20028/12/20028/12/2002 12:00:00 AMAPASS
###-#### walls insulated, owner will insulate ceiling after drywall. 8/12/2002 11:36:41 AM
BLD02-00752 BLD-Framing/Rough-in8/9/20028/12/20028/12/2002 12:00:00 AMAPART
6310187 8/12/2002 9:17:46 AM
BLD02-00251 BLD-Other8/11/20028/12/20028/12/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/11/2002 at 11:36:25. Contact: ###-####.needs f 8/12/2002 1:54:19 PM oam seal package prior to frame c/n. 8/12/2002 1:54:42 PM
BLD02-01031 BLD-Final8/12/20028/12/20028/12/2002 12:00:00 AMPFAIL
###-#### Jerry . none of this roof appears to be over a 2-in 12 pitch left c/n to provide manufactures specifications. for minimum roof slope. 8/13/2002 9:36:10 AM
BLD02-01224 BLD-Wall cover8/12/20028/12/20028/12/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/12/2002 at 08:44:37. Contact: ###-####.c/n needs completion. 8/12/2002 3:45:05 PM
BLD02-00423 BLD-Final8/12/20028/12/20028/12/2002 12:00:00 AMPPASS
###-#### Rob Mairs. electrical has approved. 8/12/2002 1:24:27 PM
BLD02-01117 BLD-Final8/12/20028/12/20028/12/2002 12:00:00 AMPNR
###-#### cathy . still in process of insulating. also not a fina insulation/ re-frame 8/12/2002 1:07:24 PM
BLD02-01542 BLD-Framing/Rough-in8/12/20028/12/20028/12/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/12/2002 at 11:22:03. Contact: .needs electrical and plans posted c/n. 8/12/2002 3:41:55 PM