BLD02-00709
| BLD-Framing/Rough-in | 8/9/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | A | PART |
|
|
###-####\\shear--Ok to side. 8/12/2002 9:11:53 AM
|
BLD02-01732
| BLD-Foundation | 8/10/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/10/2002 at 15:11:09. Contact: ###-####. Cancelled until p.m. 8/12/2002 11:11:47 AM
|
BLD02-01262
| BLD-Footing | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 06:38:21. Contact: ###-####. 7- Pier pads around steel columns-not footings. Rebar in place. 8/12/2002 12:07:47 PM
|
BLD02-01679
| BLD-Footing | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PART |
|
|
mana; Phone #: ###-#### wip--90% ready--rebar in place except missing in 4-pads (circled on approved plan) called contractor -- he will install per plans prior to placement of concrete. 8/12/2002 2:17:56 PM
|
BLD02-01807
| BLD-Foundation | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PASS |
|
|
bill; Phone #: ###-####
|
BLD02-01530
| BLD-Wall cover | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PASS |
|
|
###-#### darin
|
MEC02-02129
| Rough-in | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 09:20:26. Contact: ###-####.
|
BLD02-01395
| BLD-Energy code compliance | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PASS |
|
|
###-#### Ok to cover 8/12/2002 4:20:01 PM
|
BLD02-01098
| BLD-Conference | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | DONE |
|
|
###-#### Reviewed c/n items with contractor. 8/12/2002 3:44:49 PM
|
BLD02-01732
| BLD-Foundation | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PART |
|
|
wip--95% ready,all hd not installed at time of inspection. 8/12/2002 1:52:29 PM
|
BLD01-02679
| BLD-Final | 8/12/2002 | 8/12/2002 | 8/12/2002 12:00:00 AM | P | PASS |
|
|
C. of C. #23303 issued. 8/12/2002 1:51:26 PM
|