Inspections for the day of: Tuesday, August 12, 2003.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00720 BLD-Aging Inspection8/12/20038/12/20038/12/2003 12:00:00 AM FAIL
contractor not at site... 8/12/2003 1:19:39 PM
BLD02-00815 BLD-Aging Inspection8/12/20038/12/20038/12/2003 12:00:00 AM PASS
shows finalled 8/12/2003 1:20:50 PM
BLD02-00845 BLD-Aging Inspection8/12/20038/12/20038/12/2003 12:00:00 AM PASS
BLD03-00430 BLD-Framing/Rough-in8/11/20038/12/20038/12/2003 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 8/11/2003 at 10:50:42 AM. Contact: ###-####.
BLD03-00819 BLD-Conference8/11/20038/12/20038/12/2003 12:00:00 AMAPASS
###-####//###-####//###-####susan...need ER for product...looks ok, also referred to plan check 8/12/2003 10:48:31 AM
BLD02-00370 BLD-Framing/Rough-in8/11/20038/12/20038/12/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/11/2003 at 1:58:51 PM. ...ok to sheath inside of ext wall at west & south, 2nd fl. 8/12/2003 9:50:48 PM
BLD03-01046 BLD-Framing/Rough-in8/11/20038/12/20038/12/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 8/11/2003 at 2:05:20 PM. Contact: ###-####...c/n, fireblocks, hvac insp, justify beams...partial only 8/12/2003 9:57:45 AM
BLD03-01198 BLD-Conference8/11/20038/12/20038/12/2003 12:00:00 AMAPASS
w/ bldr re c/n 8/12/2003 1:34:10 PM
BLD03-00819 BLD-Framing/Rough-in8/12/20038/12/20038/12/2003 12:00:00 AMAPART
shear ok, need foam info
BLD03-01198 BLD-Energy code compliance8/11/20038/12/20038/12/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/11/2003 at 9:10:54 PM. Contact: ###-####....ok to cover walls/lid at 2nd fl. 8/12/2003 1:23:31 PM
BLD03-01198 BLD-Framing/Rough-in8/12/20038/12/20038/12/2003 12:00:00 AMPPART
complete floor sheathing req'd at 2nd floor, add air seal at 1st fl. 8/12/2003 1:25:47 PM
MEC03-02146 Rough-in8/12/20038/12/20038/12/2003 12:00:00 AMPPASS
still need pr and protection plates at csst 8/12/2003 11:14:15 PM
BLD03-00435 BLD-Framing/Rough-in8/11/20038/12/20038/12/2003 12:00:00 AMPPART
Sam...need to firestop plbg stacks thru 2hr fl at cavity wall; ok to cover if accessible 8/12/2003 3:21:10 PM
BLD03-01417 BLD-Conference8/11/20038/12/20038/12/2003 12:00:00 AMPPART
wendy...need city plans, verify fire 8/13/2003 12:20:52 PM
BLD01-02239 BLD-Conference8/12/20038/12/20038/12/2003 12:00:00 AMPPASS
need hvac & trade insps prior to frame...resolve P&Z issues 8/12/2003 3:20:19 PM
BLD02-00370 BLD-Framing/Rough-in8/12/20038/12/20038/12/2003 12:00:00 AMPPART
ok to install vapor barrier & sheathing, east & north walls, 2nd floor. 8/12/2003 9:51:56 PM
BLD03-00642 BLD-Final8/12/20038/12/20038/12/2003 12:00:00 AMPNR
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie... need plbg? 8/12/2003 9:52:55 PM