BLD03-01939
| BLD - Request for Extension | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | | CANC |
|
|
still working on this project.......###-#### brad
owner still in process of completing framing, needs to replace a defective glu-lam beam. will call for insp. when completed. 8/11/2004 10:03:09 AM
|
BLD04-01247
| BLD-Foundation | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 8:32:42 AM. Contact: ###-####.
|
BLD04-01626
| BLD-Foundation | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 8:33:47 AM. Contact: ###-####.
|
MEC03-02299
| Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PASS |
|
|
###-#### vladimir
|
BLD04-00798
| BLD-Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | CANC |
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Annette Moore
fire insp. must do final sign-off prior to bldg dept final 8/12/2004 10:05:51 AM
|
MEC04-02087
| Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PART |
|
|
###-#### mark
uf duct, and mech fan ok 8/12/2004 8:50:53 AM
|
BLD04-01214
| BLD-Energy code compliance | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PASS |
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
r-13 walls, r-19 betw. flrs, r-38 ceiling. c/n items ok 8/12/2004 8:33:30 AM
|
BLD04-00710
| BLD-Wall cover | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 5:45:31 PM. Contact: ###-####.
met w/ Val to discuss separation @ firewall issues. verified 4ft wrap back @ roof sheathing underside within house. need to complete extension beyond house envelope/common wall. 8/12/2004 9:41:07 AM
|
BLD04-00109
| BLD-Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | A | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
MEC03-03109
| Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | PASS |
|
|
mrs. gorringe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
existing gas piping @ unit 8/12/2004 3:58:23 PM
|
BLD04-01536
| BLD-Foundation | 8/12/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/12/2004 at 6:41:54 AM. Contact: ###-####.
|
MEC04-01699
| Final | 8/12/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
need to provide a post in garage for impact protection by final bldg insp. 8/12/2004 2:11:51 PM
|
BLD03-02364
| BLD-Final | 8/12/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | PASS |
|
|
###-#### machon
|
BLD04-01790
| BLD-Footing | 8/12/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | PASS |
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MEC04-02014
| Pressure Test | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | PASS |
|
|
arron ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
gas test @22 psi 8/12/2004 2:58:36 PM
|
MEC03-02744
| Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | FAIL |
|
|
Home owner is Karen Allumbaugh and she will be home. her # is ###-####; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
need a gas test! 8/12/2004 2:49:36 PM
|
MEC04-02122
| Final | 8/11/2004 | 8/12/2004 | 8/12/2004 12:00:00 AM | P | FAIL |
|
|
SUE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
left c/n to provide "insight" disconnect 8/12/2004 3:36:23 PM
|