ELE08-02156
| Rough-In Permanent Service | 8/12/2008 | 8/12/2008 | 8/12/2008 4:22:33 PM | P | CANC |
|
|
This inspection request is for suites A, B, and C only Phone #: ###-#### Internet Inspection Request from: Dan Surerus called contractor, told him he needs separate permits, the one used is for core and shell only, he will check out and call when permits in order
|
ELE08-02118
| Final | 8/12/2008 | 8/12/2008 | 8/12/2008 4:09:24 PM | P | PASS |
|
|
CONTACT: STEVE PANZELLA Phone #: ###-#### Internet Inspection Request from: Deb Gooden ok to final, signed structural card, no esc this project
|
ESC07-01208
| General Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:07:59 PM | P | PART |
|
|
looked ok
|
ESC08-00547
| General Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:06:55 PM | P | PART |
|
|
looked ok
|
ESC08-00357
| General Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:06:01 PM | P | PART |
|
|
looked ok
|
ESC08-00141
| General Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:04:46 PM | A | PART |
|
|
looked ok
|
ELE08-00459
| Electrical Rough-In | 8/12/2008 | 8/12/2008 | 8/12/2008 3:02:20 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/12/2008 at 9:38:44 AM. Contact: ###-####. ok to cover ceilings part lobby, conference, and shower rooms
|
ELE08-02024
| Rough-In Permanent Service | 8/12/2008 | 8/12/2008 | 8/12/2008 1:52:49 PM | P | PASS |
|
|
Hi Bob, I need the tenant sub panel (service) inspected as well as the T-grid ceiling inspected for cover. If you have any questions my foreman on site is Dave, cell ####-####. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig ok to cover ceiling, p/s exst meter pak n ok, 1 meter,
|
ELE08-01078
| Electrical Rough-In | 8/11/2008 | 8/12/2008 | 8/12/2008 12:52:06 PM | P | PASS |
|
|
shallan Phone #: ###-#### ok to pour concrete encased electrode, ric ok, will call for p/s later
|
ELE08-02175
| Final | 8/11/2008 | 8/12/2008 | 8/12/2008 9:49:56 AM | A | PASS |
|
|
contact is Ron Hanna ###-#### Thank-You final on a temp pole Phone #: ###-#### Internet Inspection Request from: Debby Ellis ok to final, no esc this project
|
ELE08-02175
| Temporary Service | 8/12/2008 | 8/12/2008 | 8/12/2008 9:49:25 AM | A | PASS |
|
|
contact is Ron Hanna ###-#### Thank-You final on a temp pole Phone #: ###-#### Internet Inspection Request from: Debby Ellis t/s o/h n ok, no esc this project
|
ELE08-02252
| Rough-In Permanent Service | 8/12/2008 | 8/12/2008 | 8/12/2008 9:29:14 AM | P | CANC |
|
|
#80670,Q#8231AWI. Wired a new power pedestal & phone cabinet for QWEST. Brian ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell Inspection cancelled from web by: Dan Mitchell
|
ELE08-01967
| Final | 8/11/2008 | 8/12/2008 | 8/12/2008 9:01:40 AM | A | PASS |
|
|
Jim is the Contact, his number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final, signed occupancy card, no esc this project
|
ELE08-01296
| Electrical Rough-In | 8/11/2008 | 8/12/2008 | 8/12/2008 8:17:29 AM | A | PASS |
|
|
UG ROUGH-IN Phone #: ###-#### Internet Inspection Request from: JENNY EMEL south parking lot lites ok to cover only
|