BLD06-03634
| FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/18/2008 5:05:41 PM | A | FAIL |
|
|
Failed per inspection comments 7/6/07.
|
BLD05-02070
| FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/18/2008 5:00:45 PM | A | PART |
|
|
Pending completion of building alarm and fire sprinkler work prior to permit final.
|
BLD06-00213
| BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 9:57:47 AM | A | DEFR |
|
|
Barb----Dave this was given temp on 6-9-06 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 6-9-06. Please let me know...thanks Phone #: ###-#### sent to fire
|
BLD05-02144
| FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/13/2008 4:52:09 PM | A | FAIL |
|
|
Building renovation is not complete, still need project related shell fire sprinkler and alarm permit finals prior to permanent occupancy certificate.
|
BLD08-01649
| FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/13/2008 8:05:44 AM | P | PASS |
|
|
Life safety inspection passed.
|
BLD08-01648
| FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:30:22 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
BLD08-00480
| FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:29:11 PM | P | FAIL |
|
|
Install approved hardware at the mechanical room door, provide "door to remain unlocked while building is occupied" signage at the main door, the existing vault door must be arranged to eliminate the potential for an occupant to be locked inside.
|
BLD08-00483
| FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:25:58 PM | P | FAIL |
|
|
Missing signage at the main entry/exit door, provide a fire extinguisher within travel distances.
|
BLD08-00492
| FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 3:24:00 PM | P | FAIL |
|
|
Provide approved hardware at the office door leading to the second exit, provide signage at the main entry/exit door or install hardware per review comments.
|
BLD08-01459
| FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 2:16:28 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
BLD07-03282
| FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 12:08:12 PM | P | FAIL |
|
|
See items indicated on fire code review notes for project fire life safety requirements.
|
FIR08-00407
| INSP-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 12:03:17 PM | A | PASS |
|
|
Fire alarm system modifications passed field testing, permit finaled.
|
FIR08-00405
| INSP-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 12:02:18 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00404
| INSP-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 12:01:35 PM | A | PASS |
|
|
Fire alarm testing completed satisfactory, permit finaled.
|
BLD07-03283
| FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 12:00:35 PM | A | NR |
|
|
Project is not in condition for final fire life safety at this time.
|
BLD07-03281
| FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 11:59:23 AM | A | NR |
|
|
Discussed items with contractor needed for life safety final.
|
FIR08-00304
| FIR-Aging Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 11:58:19 AM | | DEFR |
|
|
Pending site inspection request for verification of work completion.
|
FIR08-00408
| INSP-Final Inspection | 8/11/2008 | 8/12/2008 | 8/12/2008 11:56:39 AM | A | FAIL |
|
|
See plans for location of one non-functional fire alarm notification device to be repaired.
|
FIR08-00480
| INSP-Sprinkler Rough-in/Hydro | 8/11/2008 | 8/12/2008 | 8/12/2008 11:54:09 AM | A | FAIL |
|
|
Overhead rough-in is not approved for cover at this time due to field changes in pipe routing/sizes, 6 added heads, one deleted head, an added kitchen storage room in an upper level including 2 heads not shown on drawings, relocated heads etc. Plans will need to be resubmitted for approval matching the field installation prior to okay for cover. Noted possible obstructions by soffits at three rooms in the basement which need to comply with NFPA 13D 8.2.5.4.3, head at the riser room needs relocated as discussed for exposed CPVC riser install, be aware of possible light fixture obstructions. UG supply flush completed okay.
|
FIR08-00309
| INSP-Sprinkler Rough-in | 8/11/2008 | 8/12/2008 | 8/12/2008 11:43:21 AM | A | FAIL |
|
|
See annotations on plan set for items in need of correction including spacing at pendent heads in the womens restroom, one painted head above the stairs 2nd floor, spacing at two heads adjacent to the elevator lobby, noted two heads at the first floor with excessive loading. Relocated heads at the kitchen area are okay for cover.
|