FIR09-00033
| INSP-Sprinkler Rough-in/Hydro | 8/12/2009 | 8/12/2009 | 8/12/2009 4:10:33 PM | P | PASS |
|
|
Systems 19 and 20 were inspected today. The rough-in inspection generally passed but obstructions to the upright sprinkler heads and incorrect hanger ring sizing has been marked in red on the city approved plans.
|
FIR09-00424
| INSP-Sprinkler Rough-in | 8/12/2009 | 8/12/2009 | 8/12/2009 4:09:08 PM | P | PASS |
|
|
The 24 hour air test was started at 11:00 with 43 psi on the guage.
|
BLD09-00444
| FIRE-Final Inspection | 8/11/2009 | 8/12/2009 | 8/12/2009 1:23:22 PM | A | PASS |
|
|
Life safety passed.
|
FIR09-00313
| INSP-Final Inspection | 8/11/2009 | 8/12/2009 | 8/12/2009 1:18:57 PM | A | PASS |
|
|
Permit finaled
|
FIR07-01032
| INSP-Sprinkler Rough-in | 8/11/2009 | 8/12/2009 | 8/12/2009 11:25:33 AM | A | PART |
|
|
See the city approved plans for the piping/rooms in the kitchen area that passed rough-in. The piping can not be covered due to combustibles located above the ceiling that need addressed. I spoke to John with Petra about this item.
|
BLD09-00799
| FIRE-Final Inspection | 8/12/2009 | 8/12/2009 | 8/12/2009 9:20:54 AM | A | PASS |
|
|
Life safety passed.
|
FIR09-00447
| INSP-Final Inspection | 8/11/2009 | 8/12/2009 | 8/12/2009 9:20:33 AM | A | PASS |
|
|
Permit finaled.
|