Inspections for the day of: Thursday, August 12, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00933 FIRE-Final Inspection8/12/20108/12/20108/12/2010 4:10:55 PMPPASS
Life safety passed
FIR10-00388 INSP-Final Inspection8/11/20108/12/20108/12/2010 4:09:54 PMPPASS
Permit finaled
FIR10-00282 INSP-Final Inspection8/12/20108/12/20108/12/2010 4:01:03 PMPFAIL
Permit will be ok to final when the ceiling tile and sprinkler canopies have been installed.
FIR10-00340 INSP-Final Inspection8/12/20108/12/20108/12/2010 2:18:26 PMPPASS
Permit finaled
FIR10-00353 INSP-Final Inspection8/12/20108/12/20108/12/2010 1:19:27 PMPPASS
Permit finaled
BLD10-01116 FIRE-Final Inspection8/11/20108/12/20108/12/2010 1:13:34 PMAPASS
Life safety passed. Previous items on the correction notice have been addressed.
FIR10-00324 INSP-Final Inspection8/10/20108/12/20108/12/2010 11:12:52 AMPPASS
Permit finaled. EOL verified.
BLD10-01507 FIRE-Final Inspection8/11/20108/12/20108/12/2010 11:10:02 AMAPASS
life safety passed. the door hardware has not been installed yet but what is in the boxes , if installed, is approved single action type.
FIR10-00286 INSP-Sprinkler Rough-in8/11/20108/12/20108/12/2010 10:48:36 AMAPASS
See the city approved plans for the "clouded" sprinkler piping, with todays date that can be covered.
FIR10-00388 INSP-Sprinkler Rough-in8/11/20108/12/20108/12/2010 10:37:09 AMAPASS
Rough-in passed. Sprinkler pipe is ok to cover.