FIR11-00308
| INSP-Sprinkler Rough-in/Hydro | 8/12/2011 | 8/12/2011 | 8/12/2011 4:16:33 PM | P | PART |
|
|
Hydrostatic testing passed for the new wet system manifolds and piping.
|
BLD11-01128
| FIRE-Final Inspection | 8/11/2011 | 8/12/2011 | 8/12/2011 3:30:38 PM | P | PASS |
|
|
Fire life safety completed satisfactory.
|
FIR11-00311
| INSP-Final Inspection | 8/12/2011 | 8/12/2011 | 8/12/2011 3:29:42 PM | P | PASS |
|
|
Scope of work completed. Correction item verified. Fire sprinkler permit finaled.
|
FIR11-00333
| INSP-Final Inspection | 8/12/2011 | 8/12/2011 | 8/12/2011 3:28:08 PM | P | PASS |
|
|
Fire alarm testing passed. Permit final approved.
|
BLD10-02822
| FIRE-Final Inspection | 8/12/2011 | 8/12/2011 | 8/12/2011 3:27:19 PM | A | PASS |
|
|
Life safety passed. Fire extinguisher has been installed and tagged per R. Criner. Signature card not on site.
|
FIR11-00308
| INSP-Sprinkler Rough-in/Hydro | 8/12/2011 | 8/12/2011 | 8/12/2011 3:24:24 PM | A | PART |
|
|
Overhead rough-in for the new dry system completed. Noted items include; replace three BB1 attic heads due to modified deflector/frame orientation, one upright head at the NE dormer is obstructed by truss webs, one EQ brace secured while on site.
|
FIR11-00355
| INSP-Sprinkler Rough-in/Hydro | 8/10/2011 | 8/12/2011 | 8/12/2011 3:21:07 PM | A | PART |
|
|
Inspection completed for portions of the 1st and 2nd floors remodeled and new additions as marked on stamped plan set. Noted items include; 1st floor- missing 4 seismic braces, overspaced uprights at room 101 and 109, 2nd floor- pipe sizing at room 200 does not match plan, need to sheetrock concealed space or provide sprinkler protection, provide clearance at the floor for the 2" dry feed to the wheelchair ramp. Okay to cover new exterior canopy and ceiling above the ramp.
|