Inspections for the day of: Friday, August 12, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00179 Aging Inspection8/12/20118/12/20118/12/2011 2:56:33 PM PART
ESC11-00262 Site Preparation8/11/20118/12/20118/12/2011 2:01:20 PMANR
ESC11-00495 Site Preparation8/12/20118/12/20118/12/2011 1:52:22 PM NR
ESC11-00331 General Inspection8/12/20118/12/20118/12/2011 10:44:26 AM PASS
ESC11-00328 General Inspection8/12/20118/12/20118/12/2011 10:26:01 AMPPART
Hydroseeding complete.
ESC11-00483 Site Preparation8/12/20118/12/20118/12/2011 10:20:48 AM FAIL
Verbal to RP:
Install a stabilized construction exit. Re-install the sediment barrier along the drainage field. Will re-inspect on 8/17/2011
ESC10-00010 General Inspection8/12/20118/12/20118/12/2011 9:10:06 AM PASS