FIR13-00358
| INSP-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 5:19:34 PM | P | PASS |
|
|
Fire alarm work passed site acceptance testing. Permit finaled.
|
FIR13-00214
| INSP-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 5:17:42 PM | P | PASS |
|
|
Fire sprinkler permit approved for final status.
|
BLD13-00647
| FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/12/2013 3:36:20 PM | P | PASS |
|
|
Scope of work completed, inspection passed.
|
BLD12-03094
| FIRE-Final Inspection | 8/8/2013 | 8/12/2013 | 8/12/2013 3:34:40 PM | A | PART |
|
|
Items noted during fire life safety inspection include; hydrant orientation per BMC title 7, buffing equipment is not yet installed for verification of note #2 items 1-3, operational permit req. per fire code review note #7, post signage per note #10(B) as discussed, gates are not yet installed, see note #8 for racking over 8". EM lights/exit signs and PFE's okayed.
|
FIR13-00175
| INSP-Final Inspection | 8/12/2013 | 8/12/2013 | 8/12/2013 3:19:34 PM | P | PASS |
|
|
UG fire supply line permit approved for final.
|
FIR13-00214
| INSP-Final Inspection | 8/7/2013 | 8/12/2013 | 8/12/2013 3:18:17 PM | A | PART |
|
|
Completed trip testing, forward flow and final walkthrough.
|
BLD13-01113
| FIRE-Final Inspection | 8/9/2013 | 8/12/2013 | 8/12/2013 12:54:09 PM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR13-00232
| INSP-Final Inspection | 8/12/2013 | 8/12/2013 | 8/12/2013 12:53:04 PM | P | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|