BLD12-00687
| FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 9:25:14 AM | P | PASS |
|
|
life safety passed
|
BLD12-00688
| FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 9:24:35 AM | P | PASS |
|
|
life safety passed
|
BLD12-00686
| FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 9:24:05 AM | P | PASS |
|
|
life safety passed
|
BLD12-00685
| FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 9:23:26 AM | P | PASS |
|
|
life safety passed
|
FIR13-00343
| INSP-Sprinkler Rough-in | 8/12/2013 | 8/12/2013 | 8/12/2013 2:35:48 PM | P | PASS |
|
|
Underground is ok to cover.
|
BLD13-01575
| FIRE-Final Inspection | 8/9/2013 | 8/12/2013 | 8/12/2013 2:33:15 PM | A | PASS |
|
|
life safety passed
|
FIR13-00204
| INSP-Sprinkler Rough-in/Hydro | 8/9/2013 | 8/12/2013 | 8/12/2013 2:32:41 PM | A | FAIL |
|
|
Hydro test failed due to a visible drop in pressure at the guage. Also sprinkler coverage has not been installed under an overhead door. This work will need to be done prior to a hydro test.
|
BLD13-02178
| FIRE-Final Inspection | 8/9/2013 | 8/12/2013 | 8/12/2013 10:27:43 AM | A | FAIL |
|
|
Based on the limited information provided on the plans, at this time I'm going to require a fire extinguisher mounted and tagged as discussed and a sticker at the main exit. This is for the office area only.
|
FIR13-00113
| INSP-Final Inspection | 8/9/2013 | 8/12/2013 | 8/12/2013 10:24:25 AM | A | FAIL |
|
|
Provide knox box, provide map at facp, provide signage on FACP door, provide dedicated/locked out circuit for the FACP, provide listed enclosures for the duct smoke detectors and then test them, provide verification the kitchen hvac unit does not require a detector, provide correct zone descriptions at central station and retest everything
|