Inspections for the day of: Monday, August 12, 2013.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKimberly M. Johnson
TitleEROSION CONTROL
Phone #208-794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00584 Conference8/9/20138/12/20138/13/2013 8:00:50 AMPPART
Jason- Please call 30 min before going out Phone #: ###-####. Meet at 2:30 8/12. Called to reschedule until after perimeter gets installed on south side -8/12. Re-inspected 8/13: Still need to review approved ESC plan; berm looks good but needs extended to the east around the stockpile and to the west to capture runoff from the makeshift channel along property line. Noted existing illicit washout south of the existing disturbance around the wellhead - Note this is not from current construction.
ESC13-00801 Site Preparation8/12/20138/12/20138/13/2013 7:34:46 AMPPASS
brett Phone #: ###-####. Signage posted on fence in alley
ESC13-00737 Site Preparation8/9/20138/12/20138/12/2013 12:17:57 PMAPART
John owns all 8 lots within this development. Discussed ESC requirements for all 8. ESC sign needs posted at entrance to each lot. Gave John 1 sign at time of site prep. John to install silt fence on western perimeter. John to install stabilized exits for each lot exiting onto Barber. Site will have one centralized washout pit for all eight lots. Discussed requirement to provide washout for paint and stucco. Storm drains are still protection from development.
ESC09-00352 General Inspection8/12/20138/12/20138/12/2013 12:15:21 PM CANC
ESC11-00733 General Inspection8/12/20138/12/20138/12/2013 12:15:12 PM PASS
ESC13-00584 Site Preparation8/12/20138/12/20138/12/2013 12:00:00 AMPPART
sign up. entrance in. excavator started already. Need perimeter control on south side to protect canal. Called RP to reschedule conference until after this gets installed.
ESC13-00795 Site Preparation8/12/20138/12/20138/12/2013 12:00:00 AMPPASS
Gave green light to Chris to start work pending ESC sign is posted. Will send inspector out to verify.