FIR14-00261
| INSP-Sprinkler Rough-in | 8/11/2014 | 8/12/2014 | 8/19/2014 1:47:08 PM | P | PART |
|
|
OH rough-in at the second floor completed. Need to provide flushing cap at the south end main per plan note. Locations of sprinklers to meet obstruction criteria per NFPA 13 with regard to light fixtures and ceiling fans as discussed.
|
BLD14-02257
| FIRE-Final Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 3:26:27 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
BLD13-03346
| FIRE-Final Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 2:59:08 PM | P | PASS |
|
|
Noted correction items verified for completion. Fire life safety finaled.
|
FIR14-00565
| INSP-Sprinkler Rough-in | 8/12/2014 | 8/12/2014 | 8/12/2014 2:58:13 PM | P | PART |
|
|
UG fire supply line including the IBR to the point of connection okayed for bury. Need to provide as-built for field modification to include a 45 ell.
|
BLD13-03346
| FIRE-Final Inspection | 8/11/2014 | 8/12/2014 | 8/12/2014 11:41:04 AM | A | PART |
|
|
|
FIR14-00542
| INSP-Sprinkler Rough-in | 8/11/2014 | 8/12/2014 | 8/12/2014 11:31:08 AM | A | PART |
|
|
UG fire supply line approved for bury.
|