Inspections for the day of: Tuesday, August 12, 2014.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01207 Aging Inspection8/12/20148/12/20148/12/2014 2:57:30 PM PASS
Finaled.
ESC13-01207 DOC - Permit Finaled8/12/20148/12/20148/12/2014 2:57:17 PMPPASS
House complete and landscaped. All permits finaled. ESC conditions satisfied.
ESC14-00144 General Inspection8/12/20148/12/20148/12/2014 2:47:48 PMPPART
Site has one water truck that is still filling up at Dallas Harris #12 so there is some lapse time when truck is at site. Haul road and area where dirt is being loaded has be wettened, but need to increase spray on Warm Springs east of entrance. Talked to water truck driver Ross who said he will extend his spray.

Corrections:
1. RP has ordered street sweeper for this evening (end of day)
2. Knife River will turn over/refresh construction entrance/tracking pad.
3. Trans Systems drivers need to slow down.
ESC13-00755 Random Inspection8/12/20148/12/20148/12/2014 2:42:31 PMPPART
Dust suppression in the northeast corner of project is inadequate. Dust blowing across Warms Springs towards the existing neighborhood.

Verbal CN issued to JC of Petra. An extra water truck has been designated to that area to increase efforts. Other sites through project have adequate dust suppression.
ESC13-00070 General Inspection8/12/20148/12/20148/12/2014 2:25:29 PM PASS
Terraces condo units in progress. Silt fence perimeter along boundary is working well. No trackout to Council Springs. Not a source of fugitive dust on the Terraces site. No corrections.
ESC13-00071 General Inspection8/12/20148/12/20148/12/2014 2:25:06 PM PASS
Terraces condo units in progress. Silt fence perimeter along boundary is working well. No trackout to Council Springs. Not a source of fugitive dust on the Terraces site. No corrections.
ESC13-00072 General Inspection8/12/20148/12/20148/12/2014 2:23:45 PM PASS
Terraces condo units in progress. Silt fence perimeter along boundary is working well. No trackout to Council Springs. Not a source of fugitive dust on the Terraces site. No corrections.
ESC13-01202 Aging Inspection8/12/20148/12/20148/12/2014 2:20:45 PM PASS
Finaled.
ESC13-01202 DOC - Permit Finaled8/12/20148/12/20148/12/2014 2:20:32 PMPPASS
House complete, landscaped, and occupied. All permits finaled. ESC conditions satisfied. Brighton Homes projects in Mill District Square currently in compliance.
ESC14-00332 General Inspection8/12/20148/12/20148/12/2014 12:35:38 PM PASS
No construction activity at site. Project not yet started.
ESC14-00698 Site Preparation8/11/20148/12/20148/12/2014 11:57:24 AMAPASS
Adam Phone #: ###-####

Permit posted and site is ready for excavation. Current Eaglewood Homes projects in SunnyRidge are in compliance. Approved.
ESC14-00699 Conference8/12/20148/12/20148/12/2014 11:53:18 AMPPEND
Met RP/GC Andy at site to discuss the BMP violatons.

Corrections due today:
1. Spill absorbent to be poured on oil spill (this has been completed)
2. Brundage Bone will clean up absorbent and dispose of properly.

Tomorrow morning:
1. Hard Rock Excavation will be moving stockpiles/backfilling and gutter and sidewalk will be swept by Andy

Later in the week after utility installation:
1. Street sweeping.

Will assess need for wattles once backfill is complete.

ESC13-01188 Aging Inspection8/12/20148/12/20148/12/2014 10:55:46 AM PASS
Finaled.
ESC13-01188 DOC - Permit Finaled8/12/20148/12/20148/12/2014 10:55:32 AMPPASS
Home complete, occupied, and landscaped. Adajacent lot that was disturbed has been regraded and now has vegetation growing. ESC conditions satisfied.
ESC14-00073 General Inspection8/11/20148/12/20148/12/2014 10:43:54 AMAPASS
Cordillera townhome in progress. Parking lot has now been paved, reducing dust issues. No sediment or discharges leaving site. Stormwater drainage has been installed. Need to check for adequate protection next inspection. No corrections at this time.
ESC13-00128 General Inspection8/11/20148/12/20148/12/2014 10:26:43 AMAPASS
No activity at time of inspection. Permit located on inside of back fence. No corrections at this time. Project seems to be on hold. Frame is up, interior is unfinished.
ESC14-00701 BMP Violation8/12/20148/12/20148/12/2014 10:14:54 AMPFAIL
See ESC14-00699 for details. 3 adjacent lots with 3 seperate permits.
ESC14-00702 BMP Violation8/12/20148/12/20148/12/2014 10:14:34 AMAFAIL
See ESC14-00699 for details. 3 adjacent lots with 3 seperate permits.
ESC14-00699 BMP Violation8/12/20148/12/20148/12/2014 10:13:55 AMAFAIL
Sediment leaving site and accumulating on sidewalk, street, and permeable pavers across the street.

Oil spill in the street from concrete pumping truck. Pictures taken.

Corrections:
1. Clean up oil spill with absorbent material and dispose of appropriately.
2. Sweep up sidewalk, street, gutter.
3. Attempt to blow sediment out of pavers (will prevent infiltration.)

Meeting RP-GC on site to discuss. Written correction notice posted.
ESC13-00655 General Inspection8/12/20148/12/20148/12/2014 9:42:30 AMAPART
Grading and preparation for utilities and street have started for Aberdeen Place #4. This new activity is part of the initial 11.5 acre area of disturbance and is covered in the SWPPP. Construction entrance for phase is installed. A new washout will be provided for curb work. A sediment trench lines the perimeter and sheet flow is to the center of the site. If left inactive, will need temporary stabilization.

Corrections for Phase 2:
1. Remove damaged silt fence on Allumbaugh
2. Sweep gutters and sidewalks around the perimeter of phase 2
ESC13-00128 Site Preparation8/11/20148/12/20148/11/2014 4:05:04 PMACANC
data entry error
ESC14-00073 Site Preparation8/11/20148/12/20148/11/2014 4:04:36 PMACANC
data entry error