PLM15-02422
| Final | 8/12/2015 | 8/12/2015 | 8/12/2015 4:17:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Gonzalez
|
PLM15-02566
| Groundwork | 8/12/2015 | 8/12/2015 | 8/12/2015 3:51:23 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol 1>change 3" to 4" on TD as per approved plans 1a> trap on TD needs vented 2>dwv test failed on bathrooms 3>remove dirt from fittings in bathroom group so I can see them. 4>FYI, need vents for inteceptor, one for outlet and one to vent the tank itself 4>n
|
PLM15-02692
| Plumbing Rough-in | 8/10/2015 | 8/12/2015 | 8/12/2015 3:04:31 PM | P | CANC |
|
|
New water line with tee/capped for future sprinkler and to house. Plus rough in for a 1 bath house. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy >rough in ok >add 18 AWG blue tracer wire adjacent to water service, reinspect before covered.
|
PLM15-02562
| Water Heater Final | 8/11/2015 | 8/12/2015 | 8/12/2015 2:44:00 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette >need 3 screws per joint on all flue connections. >schd. reinspect
|
PLM15-02711
| Groundwork | 8/12/2015 | 8/12/2015 | 8/12/2015 2:30:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
PLM15-02691
| Plumbing Rough-in | 8/12/2015 | 8/12/2015 | 8/12/2015 2:08:54 PM | P | FAIL |
|
|
Todd Phone #: ###-#### no approved plans onsite still, 2nd trip
|
PLM15-01980
| Plumbing Rough-in | 8/11/2015 | 8/12/2015 | 8/12/2015 1:45:30 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM15-02686
| Plumbing Rough-in | 8/10/2015 | 8/12/2015 | 8/12/2015 1:41:09 PM | P | PASS |
|
|
Von-as late as possible Phone #: 312-220 1>change DCVA to Rp's to plan 2>certify backflows, add shut offs before 3>add tempering valve on water heater all needs done by final
|
PLM15-02698
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 11:15:00 AM | P | PASS |
|
|
|
PLM15-02698
| Water and/or Sewer | 8/12/2015 | 8/12/2015 | 8/12/2015 11:14:47 AM | A | PASS |
|
|
water ok, added backflow to permit for sprinkler system.
|
PLM15-02713
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 10:45:49 AM | P | PASS |
|
|
|
PLM15-02713
| Water and/or Sewer | 8/12/2015 | 8/12/2015 | 8/12/2015 10:45:38 AM | A | PASS |
|
|
Ready Phone #: ###-#### Inspection requested via web by Brett Simmons
|
PLM14-03369
| Water Heater Final | 8/12/2015 | 8/12/2015 | 8/12/2015 10:08:55 AM | A | PASS |
|
|
inpsected when checking on water softener inspectionon its own permit.
|
PLM14-03342
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 10:04:29 AM | P | PASS |
|
|
|
PLM14-03342
| PLM-Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 10:04:15 AM | | PASS |
|
|
softener was inspected by JJ and has a sticker.
|
PLM15-02698
| Water and/or Sewer | 8/11/2015 | 8/12/2015 | 8/12/2015 9:44:52 AM | A | FAIL |
|
|
Main contact and plumber will be Geoff please call him should you have any questions at ###-####. Anytime after 9:30 am would be great! Thank you so much! Phone #: ###-#### Inspection requested via web by Maira Guzman >no connection points allowed upstream of backflow preventer, remove and add drain down.
|
PLM15-02712
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 8:56:17 AM | P | PASS |
|
|
|
PLM15-02712
| Water and/or Sewer | 8/12/2015 | 8/12/2015 | 8/12/2015 8:56:05 AM | A | PASS |
|
|
Ready Phone #: ###-#### Inspection requested via web by Brett Simmons
|
PLM15-00978
| PLM-Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 8:22:31 AM | | FAIL |
|
|
no verification co detectors installed
|
PLM14-03367
| PLM-Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 8:19:33 AM | | FAIL |
|
|
contractor never scheduled insp.
|