FIR14-00687
| INSP-Sprinkler Rough-in/Hydro | 8/12/2015 | 8/12/2015 | 8/12/2015 4:38:34 PM | P | PART |
|
|
Rough to cover inspection for 5th floor corridors - both north and south wings. OK to cover pipe in this area. Also Hydrostatic pressure test of the two (2) dry-pipe systems for the parking garage, and the wet system for the first floor leasing offtice area. - PASSED. Also hydrotest of the wet systems for floors 3 and 4 - noth and south sides - PASSED
|
FIR13-00724
| INSP-Alarm Testing | 8/12/2015 | 8/12/2015 | 8/12/2015 3:36:43 PM | A | PART |
|
|
Continuation of fire alarm system testing for JUMP Bldg, including Helix, A/G parking structure and upper structures to the 6th floor. Testing mostly of in-duct HVAC shutdown purposes. All tested OK. More testing to commence tomorrow.
|
BLD14-00684
| FIRE-Final Inspection | 8/11/2015 | 8/12/2015 | 8/12/2015 3:32:50 PM | A | DONE |
|
|
Sign off on foundation and podium city building permits. NOTE: Last remiaing item for total building sign off, is the phone lines needed for areas of refuge communications system. Should be done within the next 2 days.
|
BLD13-00016
| FIRE-Conference | 8/11/2015 | 8/12/2015 | 8/12/2015 11:02:34 AM | A | DONE |
|
|
Meeting with Bldg. Dept. (Dave) and Hoffman (ZAC) to review areas of the building that they are looking for TCO for use by staff personnel only (approx. 10-12 persons), to get things setup in the building. No public use at this time. They are shooting for temp. TCO status by next Friday (8/21). A review and inspection of the temp. egress systems will be conducted before next Friday. Fire alarm systems are still being tested, so it is the goal to get fire sprinklers, fire alarm and egress (signs and lighting) completed by then. No use of the U/G parking area is being proposed at this time.
|