ESC14-00135
| General Inspection | 8/12/2015 | 8/12/2015 | 8/13/2015 11:52:56 AM | | CANC |
|
|
|
ESC14-01036
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 4:42:59 PM | P | PASS |
|
|
|
ESC15-00511
| Site Preparation | 8/12/2015 | 8/12/2015 | 8/12/2015 4:28:03 PM | P | PASS |
|
|
Ryan Phone #: ###-####
Pool approved to be installed and new SFH in progress. ESC permit conditions apply; must contain and dispose concrete washout and waste
|
ESC14-01011
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 4:09:54 PM | | PASS |
|
|
WIP on frame. Permit sign posted. Construction entrance installed. No corrections needed at this time.
|
ESC13-00684
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 3:22:55 PM | | PASS |
|
|
|
ESC15-00781
| Site Preparation | 8/12/2015 | 8/12/2015 | 8/12/2015 3:21:55 PM | P | PASS |
|
|
Chris Phone #: ###-####
Private storm drains have DI bag installed. Main construction entrance will be at south exit which will remain paved. Northern portion of site will have asphalt removed.
Trackout controls will be brooming dirt tires before exit and ordering street sweeper as needed.
Permit sign posted. Approved.
|
ESC15-00782
| Site Preparation | 8/12/2015 | 8/12/2015 | 8/12/2015 3:21:38 PM | P | PASS |
|
|
Chris Phone #: ###-####
Private storm drains have DI bag installed. Main construction entrance will be at south exit which will remain paved. Northern portion of site will have asphalt removed.
Trackout controls will be brooming dirt tires before exit and ordering street sweeper as needed.
Permit sign posted. Approved.
|
ESC13-00755
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:49:53 PM | | PASS |
|
|
Terraces is still in progress. Most work is on the east end of the project. The condo units are complete, landscaped and many are occupied.
Silt fence lining southern boundary was removed and a permanent stormwater control (rocky swale) has been installed and surrounding area landscaped.
No trackout, gutters around site are free of significant amounts of trackout. No corrections issued, site is in good condition currently.
|
ESC15-00556
| Random Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:36:19 PM | P | PASS |
|
|
Inpsection conducted to check progress on Highland Vally road infrastructure improvements. No dust issues at time of inspection, water truck onsite but was not in use. No plumes observed.
Warm Srpings Road is currently closed for construction.
WIP. No corrections issued.
|
ESC13-00520
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:28:34 PM | | CANC |
|
|
|
ESC13-00707
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:28:25 PM | | CANC |
|
|
|
ESC15-00236
| Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:28:08 PM | | PASS |
|
|
WIP. No violations observed.
|
ESC15-00233
| Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:27:56 PM | | PASS |
|
|
WIP. No violations observed.
|
ESC15-00232
| Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:27:26 PM | | PASS |
|
|
New home complete and landscaped. Temp DIs in DH #12 to stay installed while Tahoe projects are in progress.
|
ESC15-00232
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 2:26:49 PM | P | PASS |
|
|
|
ESC15-00230
| Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 2:24:36 PM | | PASS |
|
|
WIP. No violations at site. DIs installed on streets, trash contained.
|
ESC14-00588
| Conference | 8/12/2015 | 8/12/2015 | 8/12/2015 1:54:43 PM | P | PEND |
|
|
checking current dewatering system and log of turbidity measurements; visual check for plume...
After inspection, dewatering from irrigation pond has been halted to increase settling time for groundwater dewatering.
Going to postpone pond dewatering while groundwater dewatering is occuring.
|
ESC14-00971
| Site Final | 8/11/2015 | 8/12/2015 | 8/12/2015 11:53:26 AM | A | PEND |
|
|
call Harding Homes to remove DI bags in Abode Sub. VM left to RP.
|
ESC14-00432
| Random Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 11:37:55 AM | P | PART |
|
|
Hayden Homes has recently cleaned streets and emptied out DI bags. SFH sites are clean with permits posted.
Next inspection will request for removal silt fence along the south side of 5-miles creek since there is no construction abutting that bank and it is stabilized.
Also will work on enforcing application to suppress fugitive dust caused by wind in areas that are not going to be built out within 2 weeks.
|
ESC15-00739
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 11:16:57 AM | P | PASS |
|
|
Permit sign posted. Culdesac clean with no loose dirt or discharges. Construction waste and material are contained. WIP
|
ESC13-01159
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 10:48:11 AM | | PART |
|
|
Corrections completed:
1. DI bags maintained and re-installed. 2. Perimeter wattles installed on Hiawatha as requested. 3. Roads and gutters are free of loose sediment or trackout.
Corrections remianing: - Post SWPPP and ESC permit sign for Peppermil
|
ESC15-00342
| Site Final | 8/12/2015 | 8/12/2015 | 8/12/2015 10:44:05 AM | P | PASS |
|
|
Construction complete. Home is landscaped and occupied. Temp BMPs in Peppermill to remain for ongoing SFH construction. CBH keeping site in compliance.
|
ESC14-01185
| Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 10:40:05 AM | | PASS |
|
|
Home complete, site cleaned, landscaped, and ESC permit conditions satisfied. Permit closed.
|
ESC14-01185
| DOC - Permit Finaled | 8/12/2015 | 8/12/2015 | 8/12/2015 10:39:31 AM | P | PASS |
|
|
|
ESC14-01061
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 10:06:26 AM | | PASS |
|
|
Vertical construction in progress at Discout Tire. Site utilities and sewer are installed. Area of disturbance is not yet paved, but runoff stays onsite due to preservation of perimeter curbing and asphalt.
No trackout, discharges, or fugitve dust observed. No windblown trash around site. Permit sign posted on job trailer.
Approved.
|
ESC14-00438
| General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 9:22:42 AM | | CANC |
|
|
|