BLD16-01087
| FIRE-Conference | 8/12/2016 | 8/12/2016 | 8/12/2016 2:22:35 PM | P | DONE |
|
|
Went over life safety requirements with Phil
|
BLD16-01087
| FIRE-Final Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 2:22:11 PM | P | PART |
|
|
Fire life safety for the new Deli area passed.
|
FIR16-00525
| INSP-Final Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 12:40:10 PM | P | PASS |
|
|
Permit finaled
|
BLD16-01942
| FIRE-Final Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 12:39:53 PM | P | PART |
|
|
A temporary for life safety is being given with Scott Arellano's permission until the fire sprinkler work is complete which per agreement will be as soon as possible.
|
FIR16-00473
| INSP-Sprinkler Rough-in/Hydro | 8/11/2016 | 8/12/2016 | 8/12/2016 12:32:05 PM | A | PASS |
|
|
The underground hydro test for Building #2 passed
|
FIR16-00522
| INSP-Final Inspection | 8/11/2016 | 8/12/2016 | 8/12/2016 12:30:18 PM | A | PASS |
|
|
Permit finaled
|
BLD16-01942
| FIRE-Final Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 10:27:26 AM | P | FAIL |
|
|
Sprinkler system modifications are required.
|
FIR16-00499
| INSP-Final Inspection | 8/11/2016 | 8/12/2016 | 8/12/2016 9:11:19 AM | A | PASS |
|
|
Permit finaled. Hood suppression functioned correctly. Gas valve needed adjustment.
|
BLD16-00343
| FIRE-Final Inspection | 8/11/2016 | 8/12/2016 | 8/12/2016 8:48:03 AM | A | PASS |
|
|
life safety passed
|