Inspections for the day of: Monday, August 12, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-00116 ELE-Aging Inspection8/12/20198/12/20198/16/2019 12:39:47 PM DONE
Need to schedule a final inspection. Would like to meet and view literature on components installed.
ELE19-02235 Electrical Rough-In8/12/20198/12/20198/12/2019 3:36:55 PMPCANC
Please inspect new AC unit locations and connections.
General Contractor would like them inspected for use.
Phone #: ###-#### Inspection requested via web by Kevin Perez Re-scheduled for 8/13, had a couple of questions.
ELE19-00005 Electrical Rough-In8/12/20198/12/20198/12/2019 2:23:40 PMPPASS
Contact: Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover coffee bar NW corner.
ELE19-02985 Temporary Service8/12/20198/12/20198/12/2019 1:33:58 PMPPASS
Phone #: ###-#### Inspection requested via web by Don Conley Small fire required IDP to disconnect service. No damage done to service, but contractor would like to re-energize and use for a temp service. t/s o/h rec ok
ELE19-02907 Conference8/9/20198/12/20198/12/2019 1:32:35 PMADONE
MITCH- PLEASE 30 min upon arrival Phone #: ###-#### Discussed change out of old service due to tree damage. New overhead to stay in existing location. It penetrates thin metal roof and then directly through soffitt. Thin metal roof is not walkable so will allow 30" clearance from roof.
ELE19-02929 Permanent Service8/6/20198/12/20198/12/2019 1:00:06 PMPPASS
Call Fred with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan 2 grd rods. p/s o/h rec ok
ELE19-02336 Final8/9/20198/12/20198/12/2019 12:59:30 PMAFAIL
Phone #: ###-#### Inspection requested via web by Same Electric Homeowner added an island after electrical was finished. Island needs recept to cover code requirements. 2 options, either remove flooring and saw cut floor to provide powerr for island, or remove insland completely for a final inspection.
ELE19-01505 Final8/9/20198/12/20198/12/2019 12:58:00 PMACANC
Phone #: ###-#### Inspection requested via web by Same Electric Please call this in when kitchen/bed final when they are ready for inspection.
ELE18-04546 Final8/12/20198/12/20198/12/2019 12:38:16 PMPPASS
Will be ready for complete final later this am. Thank you Mark Phone #: ###-#### Inspection requested via web by Eric Brown Ok final house. B&B to pull permit for hottub. Controller for drive way heat on order. Will check internal GFI on hottub final.
ELE19-02935 Permanent Service8/9/20198/12/20198/12/2019 12:26:42 PMPCANC
Changing overhead service to underground. Shutdown starts at 10:00 AM, should be ready for inspection around 2:00 PM. Phone #: ###-#### Inspection requested via web by Caleb Gaylord Disconnect was going to be done to late by IDP.
ELE19-02915 Electrical Rough-In8/9/20198/12/20198/12/2019 9:33:15 AMAPASS
We will be on site with all equipment Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. All items UL listed.