BLD18-03667
| BLD-Final | 8/12/2019 | 8/12/2019 | 8/13/2019 8:52:08 AM | P | PEND |
|
|
joe Phone #: ###-####//discussed ramp at exit door--too steep--plans show 1:12//
|
BLD19-02152
| BLD-Final | 8/12/2019 | 8/12/2019 | 8/12/2019 4:03:10 PM | P | PASS |
|
|
Dustin ###-####//building has been removed//
|
BLD19-02152
| DOC - Permit Finaled | 8/12/2019 | 8/12/2019 | 8/12/2019 4:02:48 PM | P | PASS |
|
|
|
BLD19-00362
| BLD-Foundation | 8/9/2019 | 8/12/2019 | 8/12/2019 4:02:32 PM | P | PASS |
|
|
TROY- REBAR INSPECTION Phone #: ###-####//area d slab// final slab pour//pending all specials//
|
BLD19-00556
| BLD-Conference | 8/9/2019 | 8/12/2019 | 8/12/2019 2:35:36 PM | P | DONE |
|
|
check on project..footings and wall may have been poured--footing inspection failed on 7/12/2019//footings and foundation have been poured//footing inspection failed on 7/12 (no pins to verify setbacks for canal easment)//correctin notice issued to locate pins and verify easement setbacks prior to continuing on preject//
|
BLD18-02051
| BLD-Framing/Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 2:20:55 PM | P | PASS |
|
|
Mike Phone #: ###-####//add fire blocking at stairs and concealed space//ok to insulate only//
|
BLD19-00261
| BLD-Final | 8/9/2019 | 8/12/2019 | 8/12/2019 12:45:21 PM | P | PASS |
|
|
Jason Phone #: ###-####//final complete per plans//no fixed seating in the break room//
|
BLD19-01915
| BLD-Wall Bracing | 8/12/2019 | 8/12/2019 | 8/12/2019 11:26:04 AM | A | FAIL |
|
|
Correction notice issued//need hold downs per plans//panel nailing needs to be fastened to sill plate//
|
BLD19-01915
| BLD-Framing/Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 11:24:17 AM | A | CANC |
|
|
Stan Phone #: ###-####//needs wall bracing inspection//
|
BLD19-02644
| BLD-Footing | 8/9/2019 | 8/12/2019 | 8/12/2019 10:39:44 AM | A | PASS |
|
|
Inspection close to 10-11 AM if at all possible, please. Phone #: ###-#### Inspection requested via web by David Dexter
|
BLD18-03484
| BLD-Aging Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 10:39:19 AM | | PASS |
|
|
still working on projects
|
BLD19-02504
| BLD-Foundation | 8/8/2019 | 8/12/2019 | 8/12/2019 9:36:13 AM | A | PASS |
|
|
Eric Phone #: ###-####//footing depths ok per plans// rebar tied per engineering//
|