Inspections for the day of: Wednesday, August 12, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-01330 BLD-Framing/Rough-in8/12/20208/12/20208/12/2020 3:14:09 PMPPASS
Phone #: ###-#### Inspection requested via web by James Jackson
BLD19-01479 BLD-Concrete8/12/20208/12/20208/12/2020 2:18:36 PMPDEFR
MIDDLE SECTION OF SOUTH SIDE APARTMENTS SOG AND THICKENED SLAB POUR. Phone #: ###-#### Inspection requested via web by Garrett Camp// to dave
BLD19-03606 BLD-Framing/Rough-in8/12/20208/12/20208/12/2020 2:15:18 PMPPASS
Chris *screened Phone #: ###-#### bathrooms 2nd floor ok to cover// gyp ceillings 2nd floor ok to cover// wall framing 1st floor ok
BLD20-02642 BLD-Final8/11/20208/12/20208/12/2020 10:56:26 AMAPASS
Don Phone #: ###-####
BLD20-02642 DOC - Permit Finaled8/12/20208/12/20208/12/2020 10:56:10 AMPPASS
BLD20-01584 BLD-Framing/Rough-in8/10/20208/12/20208/12/2020 10:23:31 AMAPART
Todd Phone #: ###-#### Inspection requested via web by Todd Twedt bearing wall stud cut out by hvac min 24 inches oc.// ok to insulate.
BLD20-02568 BLD-Final8/11/20208/12/20208/12/2020 9:50:48 AMAPASS
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-02568 DOC - Permit Finaled8/12/20208/12/20208/12/2020 9:50:36 AMPPASS
BLD20-00193 BLD-Foundation8/11/20208/12/20208/12/2020 9:38:52 AMAPASS
10:00 AM inspection please (concrete at 12:00pm) Thank you. Phone #: ###-#### Inspection requested via web by Edgar Sanchez
BLD20-00276 BLD-Foundation8/11/20208/12/20208/12/2020 9:38:40 AMAPASS
10:00 AM inspection please (concrete at 12:00pm) thank you. Phone #: ###-#### Inspection requested via web by Edgar Sanchez
BLD19-02339 BLD-Wall cover8/11/20208/12/20208/12/2020 9:38:23 AMAPASS
Please come reinspect 4th floor bathroom for lid cover. 5th and 6th floor for lid cover in bathrooms. Phone #: ###-#### Inspection requested via web by Andy Pense east and main shaft assemblies and penatrations ok// 4 and 5 th ceillings ok shaft protection ok. rfi for coloum protction empeded by horrazontal tube steel must meet 2 hr struc. prorection.
BLD20-01875 BLD-Final8/11/20208/12/20208/12/2020 12:00:00 AMPCANC
Isaac *screened - please call ahead - Phone #: ###-####