ELE20-00466
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 3:29:01 PM | P | PASS |
|
|
Mitch */Virtual Inspection Requested.*/ Phone #: ###-#### Owner elderly, does not want exposure to others Confirmed labelling verbally. Final ok
|
ELE19-00601
| Electrical Rough-In | 8/12/2020 | 8/12/2020 | 8/12/2020 3:03:44 PM | P | PART |
|
|
Cover for 4th/5th elevator lobbies. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 5 elevator lobby access located too far from damper disconnecting means, can installed in access framed. Level 4 elevator lobby rough in ok cover,
|
ELE19-04799
| Conference | 8/12/2020 | 8/12/2020 | 8/12/2020 2:40:52 PM | P | PASS |
|
|
Discussed grounding requirements of each service. Bonding of grounded conductor completed in vault. Parallel grounded conductors and grounding conductor installed from vault to each service disconnecting means . As per 250.24 (A),(B), and (C) stating a main bonding jumper shall be installed at each service disconnecting means connecting the grounded conductor to the enclosure and equipment grounds. This requirement will create a parallel path between the grounded conductors and the grounding conductor from vault to each service. To comply with 250.24 the equipment ground from the vault to each service will need to be removed, or abandoned and as permitted by 250.142 non-current carrying metal of service enclosure will bond thru the grounded conductors.
|
ELE20-01794
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 2:19:30 PM | P | PART |
|
|
partial final for upstairs conference rooms and training room and on 1st floor work lab and downstairs bathroom Tyson is site contact ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott 1 Receptacle in lab requires GFCI, with in 6' of sink as per 210.8(B). Areas noted TCO ok
|
ELE20-02806
| Permanent Service | 8/12/2020 | 8/12/2020 | 8/12/2020 1:43:47 PM | P | PASS |
|
|
The disconnect on the NW corner of Parkcenter Blvd ; River Run Dr. is ready for inspection. Please call Joe with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean Ohm test results will be provided. p/s u/g n ok
|
MIS20-00251
| ELE-Conference | 8/11/2020 | 8/12/2020 | 8/12/2020 1:26:33 PM | A | DONE |
|
|
remodelling without permits Phone #: ###-#### Appears to be a kitchen cabinet upgrade, some windows and carpet has been removed from what is in dumpster. No answer at door. Left correction notice asking owner to call to discuss.
|
ELE20-02817
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 10:52:30 AM | A | FAIL |
|
|
Call Andrew with any questions. Thank you. Phone #: ###-#### Inspection requested via web by Kelly Tarter 250.24- Main bonding jumper shall be installed to connect the grounded conductor to the enclosure and the equipment grounding conductors of the service disconnecting means.
|
ELE20-02748
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 10:05:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Rough in ok cover p/s u/g n ok
|
ELE20-02757
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 9:45:13 AM | A | CANC |
|
|
Please call Chris for R/I of west stairwell conduit and boxes. Thanks!!!! Phone #: ###-#### Inspection requested via web by Rafael Castillo Dupicate request.
|
ELE20-02757
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 9:44:40 AM | A | PASS |
|
|
Please call Chris for R/I of west stairwell conduit and boxes. Thanks!!!! Phone #: ###-#### Inspection requested via web by Rafael Castillo Level 1 west stair pour rough in ok cover.
|
ELE19-02700
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 9:27:36 AM | A | PASS |
|
|
Switchgear inspection to energize. Contact Brandon Robinson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek OK to energize switch gear 2NHASWD.
|
ELE19-03829
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 9:05:33 AM | A | PASS |
|
|
5th Floor bathrooms hard lids and 9th Floor walls. Contact Shawn Evins. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 1 west entries interior and exterior, Level 5 bathroom hard lids, Level 10 core walls as noted on contractor print rough in ok cover.
|
ELE19-03624
| Electrical Rough-In | 8/10/2020 | 8/12/2020 | 8/11/2020 2:04:29 PM | P | CANC |
|
|
Rough in for cover of hood vent in kitchen Contact Alex Ybarra Thank you, Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|
ELE19-03624
| Electrical Rough-In | 8/10/2020 | 8/12/2020 | 8/10/2020 12:48:24 PM | A | CANC |
|
|
Rough in for cover of hood vent in kitchen. Contact Alex Ybarra Thank you, Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|