Inspections for the day of: Tuesday, August 13, 1996.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC96-02274 INSP - Framing/ Rough-in8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - BUILDING 1/ FAB 1 - DIFFUSION FNL -OK FINAL SIGN PERM OCC CARD
MEC96-02282 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02282 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02284 INSP - Gas pressure test8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - WILL NOT BE READY UNTIL AFTER 11AM. GAS LINE TO POOL HEATER. GP -OK GAS PIPING FINAL
MEC96-02285 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02285 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02286 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02286 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02287 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - RGHN-OK ROUGH IN
MEC96-02287 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - RGHN-OK ROUGH IN
MEC96-02288 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02288 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02289 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02289 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02290 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02290 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02291 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02291 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02293 INSP - Framing/ Rough-in8/12/19968/13/19968/13/1996 12:00:00 AMAPASS
08/13/96 337 - RGHN-OK ROUGH IN
MEC96-00937 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPART
08/13/96 337 - on 1st floor south tour mri and out patient door z. hope I CANNOT FIND THE WORK S YOUNT WILL BE BACK IN THE AM
MEC96-00937 INSP - Final8/12/19968/13/19968/13/1996 12:00:00 AMAPART
08/13/96 337 - on 1st floor south tour mri and out patient door z. hope I CANNOT FIND THE WORK S YOUNT WILL BE BACK IN THE AM
MEC96-01723 INSP - Final8/13/19968/13/19968/13/1996 12:00:00 AMPPASS
08/13/96 337 - FNL -OK FINAL SIGN PERM OCC CARD
MEC96-01723 INSP - Final8/13/19968/13/19968/13/1996 12:00:00 AMPPASS
08/13/96 337 - FNL -OK FINAL SIGN PERM OCC CARD
MEC96-01864 INSP - Retro Fit (check note)8/13/19968/13/19968/13/1996 12:00:00 AMPPART
08/13/96 337 - LATE AFTERNOON PLEASE. GP -OK GAS PIPING EQUIP NOT READY
MEC96-02108 INSP - Gas pressure test8/12/19968/13/19968/13/1996 12:00:00 AMPPASS
08/13/96 337 - 3rd attemp to pass. 2 systems side by side west side of b GP -OK GAS PIPING
MEC96-02272 INSP - Gas pressure test8/13/19968/13/19968/13/1996 12:00:00 AMPPASS
08/13/96 337 - FNL -OK FINAL
MEC96-02297 INSP - Framing/ Rough-in8/13/19968/13/19968/13/1996 12:00:00 AMPFAIL
08/13/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED I NEED TO KNOW WHAT WORK WAS DONE