PLM01-03942
| Final | 8/12/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 13:08:33. Contact: ###-####. call tim ###-#### for access
|
PLM02-02485
| Sprinkler (Final) | 8/12/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PASS |
|
|
###-#### BILL
|
PLM01-03114
| Water and/or Sewer | 8/13/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PART |
|
|
storm drain future stubs at z-19 test ok
|
PLM02-02491
| Sprinkler (Final) | 8/13/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | P | PASS |
|
|
chad ###-####
|
PLM02-02365
| Plumbing Rough-in | 8/13/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | P | PASS |
|
|
the T&P drain is run to the outside ok, the grond floor below the water heater platform is going to get THICK ceramic tile so it will be below 8' to the platform and a ladder will not be required. 8/13/2002 2:10:40 PM
|
PLM02-02484
| Plumbing Rough-in | 8/12/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | P | PASS |
|
|
###-#### MISTY
|