BLD02-00175
| BLD-Conference | 8/12/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PASS |
|
|
###-#### w/ bldr, arch, & mech eng'r.... install hvac per plan...will consult GS & advise. ok to "wrap" panel for 1hr const at occ sep. or corridor. 8/13/2002 11:53:23 AM
|
BLD02-01080
| BLD-Framing/Rough-in | 8/12/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PART |
|
|
###-####; walls ok, corridor is tunneled, ok to continue 8/13/2002 11:51:26 AM
|
BLD01-02970
| BLD-Conference | 8/12/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PART |
|
|
dave; Phone #: ###-####; c/n, need eng's ok & spec. insp report for int cut concrete, resolve hand/guard rail issues for perm occ. 8/13/2002 10:49:35 AM
|
BLD02-01782
| BLD-Conference | 8/13/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | A | PART |
|
|
c/n issued : provide spec insp as reqd for conc cuts, steel jamb assy...
|
BLD02-00175
| BLD-Conference | 8/13/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | P | PASS |
|
|
W/ GS install hvac per plan... 8/13/2002 4:54:09 PM
|
BLD02-01954
| BLD-Final | 8/13/2002 | 8/13/2002 | 8/13/2002 12:00:00 AM | P | PASS |
|
|
bruce ###-####... 8/13/2002 5:02:03 PM
|