Inspections for the day of: Tuesday, August 13, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01207 BLD-Final8/11/20028/13/20028/13/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/11/2002 at 20:06:39. Contact: ###-####.
BLD01-01778 BLD-Footing8/12/20028/13/20028/13/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/12/2002 at 09:27:02. Contact: ###-####.ok about 80 percent of footing for home complete. 8/13/2002 11:12:21 AM
BLD02-01133 BLD-Framing/Rough-in8/12/20028/13/20028/13/2002 12:00:00 AMAFAIL
###-#### bill c/n posted. 8/13/2002 10:51:10 AM
BLD02-00752 BLD-Framing/Rough-in8/12/20028/13/20028/13/2002 12:00:00 AMACANC
dean ; Phone #: ###-####
BLD01-00736 BLD-Final8/12/20028/13/20028/13/2002 12:00:00 AMAPART
###-#### CLAY need the handrails in the stair tower repaired and 20 min doors at the lower rear exit,pool,area. rest room hc unit, contractor on site other items ok. 8/13/2002 12:52:08 PM
BLD02-01686 BLD-Foundation8/12/20028/13/20028/13/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/12/2002 at 16:21:28. Contact: ###-####.wip. 8/13/2002 9:48:51 AM
BLD02-01887 BLD-Footing8/13/20028/13/20028/13/2002 12:00:00 AMPPASS
Steve - ###-####
BLD02-00772 BLD-Final8/13/20028/13/20028/13/2002 12:00:00 AMPCANC
###-#### ROBERT . 8/13/2002 4:13:51 PM.This room does not meet code, A permit shold have never been issued as there is no plans and the so called existing patio is non conforming,also no footings this structure sits on blocks, no lateral support. Also not it is fully insulated and will be completly drywalled ? 8/13/2002 4:34:49 PM
BLD02-01256 BLD-Framing/Rough-in8/13/20028/13/20028/13/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/13/2002 at 10:30:06. Contact: ###-####.non bearing walls have been drywall w-o insp appears ok they will need to call for a re-inspection of fire walls above ceiling before tile. 8/13/2002 4:41:57 PM
BLD01-01527 BLD-Final8/13/20028/13/20028/13/2002 12:00:00 AMPPASS
BLD01-02802 BLD-Conference8/13/20028/13/20028/13/2002 12:00:00 AMPPART
meet with plan checker and tennant to resolve c/n for roll up doors 1hr. 8/13/2002 4:40:54 PM
MEC02-01717 Final8/12/20028/13/20028/13/2002 12:00:00 AMPPASS
call to meet for access Gary Dawson ###-####
MEC02-01759 Final8/12/20028/13/20028/13/2002 12:00:00 AMPFAIL
call to meet for access Gary Dawson ###-####c/n posted. 8/13/2002 2:28:13 PM
BLD02-01334 BLD-Final8/12/20028/13/20028/13/2002 12:00:00 AMPFAIL
call to meet for access Gary Dawson ###-#### c/n posted. 8/13/2002 3:25:41 PM