PLM03-01712
| PLM-Aging Inspection | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | | PASS |
|
|
must still be workin on it, noones called me for any more inspections 8/13/2003 9:14:00 AM
|
PLM03-02435
| Plumbing Rough-in | 8/12/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | A | PART |
|
|
FRANK YOUNG; Phone #: ###-#### Internet Inspection Request from: Pam Masselli part ri room 302 ok to cover 8/13/2003 10:11:48 AM
|
PLM03-02421
| Final | 8/12/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | A | PASS |
|
|
melanie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 8/13/2003 10:29:18 AM sp final ok 8/13/2003 10:29:23 AM
|
PLM03-02497
| Final | 8/12/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | A | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs wh final ok 8/13/2003 10:56:07 AM
|
PLM03-01809
| Final | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 8:10:27 AM. Contact: ###-####. final ok 8/13/2003 2:26:23 PM
|
PLM03-01808
| Final | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 8:11:40 AM. Contact: ###-####. final ok 8/13/2003 2:26:38 PM
|
PLM03-02461
| Sprinkler (Final) | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | PASS |
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie existing tie in to service sprinkler final ok 8/13/2003 1:49:57 PM
|
PLM03-02006
| Plumbing Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser water sizing is way off of what the engineer desighned, called him and told him what it looked like, he was going to make a decission and call me, musgrove. 8/13/2003 3:13:51 PM
|
PLM03-02500
| Sprinkler (Final) | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | FAIL |
|
|
###-#### lower shutoff and drain, test dcva 8/13/2003 4:47:37 PM
|
PLM03-02479
| Sprinkler (Final) | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | PASS |
|
|
###-#### exposed connect 8/13/2003 4:12:39 PM ons added clamps final ok 8/13/2003 4:12:50 PM
|
PLM03-01166
| Final | 8/13/2003 | 8/13/2003 | 8/13/2003 12:00:00 AM | P | FAIL |
|
|
trim incomplete john said it was ready but it aint, needs a sprinkler permit
|