FIR07-00678
| INSP-Sprinkler Rough-in | 8/9/2007 | 8/13/2007 | 8/13/2007 5:18:40 PM | P | PASS |
|
|
Sprinkler piping is ok to cover
|
BLD07-02018
| FIRE-Final Inspection | 8/13/2007 | 8/13/2007 | 8/13/2007 4:13:39 PM | P | PASS |
|
|
fire life safety passed.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 4:12:35 PM | P | PASS |
|
|
See the resubmitted fire sprinkler plans for locations where the reconfigured piping is approved for cover.
|
BLD07-00835
| FIRE-Final Inspection | 8/13/2007 | 8/13/2007 | 8/13/2007 3:26:23 PM | P | PASS |
|
|
life safety passed
|
FIR07-00130
| INSP-Sprinkler Rough-in | 8/10/2007 | 8/13/2007 | 8/13/2007 2:26:41 PM | P | PART |
|
|
The hangers on the hallway mains have been corrected accept at a couple of locations where the screws could use acouple of more turns. Approximately 60 pendant heads have been installed on 401 canopies so that the light fixtures are no longer a problem. Also I found 3 sprinkler pendants that are located less than the required 8' apart and will need to be relocated. I asked the fitter to verify no others had been missed.
|
FIR07-00244
| INSP-Final Inspection | 8/9/2007 | 8/13/2007 | 8/13/2007 12:30:05 PM | P | CANC |
|
|
Per the fitter the work is not done yet and the inspection will have to be rescheduled.
|