Inspections for the day of: Wednesday, August 13, 2008.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00532 INSP-Final Inspection8/13/20088/13/20088/13/2008 4:23:49 PMPFAIL
This project is not ready for a final inspection but was ready for a rough-in inspection. The sprinkler piping is ok to cover.
FIR06-00871 INSP-Conference8/13/20088/13/20088/13/2008 4:22:42 PMPDONE
I spoke to MIke with Peak Alarm about getting this permit finaled. He stated that he would make sure to get it scheduled if it had not been already signed off when the HeadMasters School opened.
BLD08-01616 FIRE-Final Inspection8/13/20088/13/20088/13/2008 3:15:54 PMPPASS
Life safety passed
BLD08-00984 FIRE-Final Inspection8/12/20088/13/20088/13/2008 1:57:13 PMAFAIL
The project related fire alarm permit needs to be finaled. Also the very west most second floor corridor exit sign needs repaired and another needs to be added at the second floor elevator corridor/main corridor junction as shown on the city approved drawings. All other items are ok.
FIR08-00397 INSP-Final Inspection8/12/20088/13/20088/13/2008 1:55:37 PMAFAIL
All of the previous deficiencies have been corrected. Once we were able to test the audio/visual devices we found that the second floor horns are not syncronized as required per NFPA 72 - 6.8.6.5.3. The duct smoke detectors tested ok.
BLD08-01431 FIRE-Final Inspection8/12/20088/13/20088/13/2008 9:40:48 AMAPASS
life safety passed