ESC09-00494
| Site Preparation | 8/13/2009 | 8/13/2009 | 8/13/2009 4:47:25 PM | P | PART |
|
|
wip on MMPs,, need to stake down barrior,, verbal correction
|
ESC08-00939
| Site Final | 8/12/2009 | 8/13/2009 | 8/13/2009 4:45:15 PM | A | PASS |
|
|
|
ESC08-00939
| DOC - Permit Finaled | 8/13/2009 | 8/13/2009 | 8/13/2009 4:43:25 PM | P | PASS |
|
|
|
BLD09-01251
| BLD-Final | 8/13/2009 | 8/13/2009 | 8/13/2009 4:42:20 PM | P | NR |
|
|
Kevin Phone #: ###-#### frame ok,, not final
|
BLD09-01251
| BLD-Framing/Rough-in | 8/13/2009 | 8/13/2009 | 8/13/2009 3:44:34 PM | P | PASS |
|
|
Kevin Phone #: ###-#### wall frame ok
|
BLD08-02307
| BLD-Final | 8/12/2009 | 8/13/2009 | 8/13/2009 3:43:12 PM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: SHANE JAYO final ok pending hillside
|
BLD09-01052
| BLD-Framing/Rough-in | 8/13/2009 | 8/13/2009 | 8/13/2009 1:57:16 PM | P | PART |
|
|
Ben Phone #: ###-#### ok to insulate,, need plumbing to look at one more time
|
BLD09-00757
| BLD-Footing | 8/12/2009 | 8/13/2009 | 8/13/2009 12:50:17 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/12/2009 at 5:03:12 PM. Contact: ###-####. interior point load ftg ok
|
ESC09-00256
| Site Preparation | 8/12/2009 | 8/13/2009 | 8/13/2009 12:26:40 PM | A | PASS |
|
|
|
BLD09-00710
| BLD-Foundation | 8/12/2009 | 8/13/2009 | 8/13/2009 12:25:59 PM | A | PASS |
|
|
greg Phone #: ###-####
|
BLD09-01063
| BLD-Framing/Rough-in | 8/12/2009 | 8/13/2009 | 8/13/2009 11:55:05 AM | A | PART |
|
|
Please call at least 30 mins prior to inspection so he can meet ya there-Preston Phone #: ###-#### need hangers per truss eng on hip girders,, ok to cover after that
|
BLD09-01311
| BLD-Footing | 8/12/2009 | 8/13/2009 | 8/13/2009 11:35:13 AM | A | PART |
|
|
Kevin Phone #: ###-#### wip,, p/l is on far side of fence
|
BLD09-00145
| BLD-Footing | 8/12/2009 | 8/13/2009 | 8/13/2009 10:55:00 AM | A | PART |
|
|
Mark Phone #: ###-#### ok pending sp
|