FIR09-00408
| INSP-Supply line flush | 8/13/2009 | 8/13/2009 | 8/14/2009 11:31:46 AM | P | PART |
|
|
The underground supply piping is ok to cover except where the thrust blocks are needed.
|
FIR08-00720
| INSP-Final Inspection | 8/12/2009 | 8/13/2009 | 8/13/2009 3:42:10 PM | P | PASS |
|
|
Permit finaled.
|
FIR09-00455
| INSP-Final Inspection | 8/12/2009 | 8/13/2009 | 8/13/2009 3:41:37 PM | A | FAIL |
|
|
All items have been corrected except now the exhaust fan is shutting down during activation of the suppression system which it can not do.
|
FIR09-00454
| INSP-Sprinkler Rough-in/Hydro | 8/12/2009 | 8/13/2009 | 8/13/2009 3:40:24 PM | A | FAIL |
|
|
Too many heads have been supplied from a single 1" outlet without verification of meeting all requirements of the use of Room Design method. Don and I discussed this topic extensively and he is going to follow up on wall ratings or provide separate supplies. Also insulation in hanging down from the deck blocking sprinkler coverage.
|
FIR09-00456
| INSP-Sprinkler Rough-in/Hydro | 8/12/2009 | 8/13/2009 | 8/13/2009 12:03:22 PM | A | PART |
|
|
See the city approved plans for locations where piping is approved
|
FIR09-00424
| INSP-Sprinkler Rough-in/Hydro | 8/12/2009 | 8/13/2009 | 8/13/2009 10:57:54 AM | A | PASS |
|
|
The 24 air test passed.
|