Inspections for the day of: Thursday, August 13, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00468 Aging Inspection8/13/20098/13/20098/13/2009 4:22:09 PM DONE
ESC07-00468 DOC - Permit Finaled8/13/20098/13/20098/13/2009 4:21:57 PMPPASS
ESC08-00491 Conference8/13/20098/13/20098/13/2009 4:21:15 PMPDONE
Verbal to RP (George):
Protect flow channel at the back end of project area. Will re-inspect on site final inspection.
ESC09-00497 Site Preparation8/13/20098/13/20098/13/2009 3:47:11 PM NR
ESC09-00306 Site Preparation8/6/20098/13/20098/13/2009 1:05:12 PMANR
ESC07-00471 Aging Inspection8/13/20098/13/20098/13/2009 1:04:59 PM DONE
ESC07-00471 DOC - Permit Finaled8/13/20098/13/20098/13/2009 1:04:51 PMPPASS
ESC08-00585 General Inspection8/13/20098/13/20098/13/2009 1:02:53 PM DONE
ESC07-00470 Aging Inspection8/13/20098/13/20098/13/2009 1:02:45 PM DONE
ESC07-00470 DOC - Permit Finaled8/13/20098/13/20098/13/2009 1:02:37 PMPPASS
ESC09-00181 Conference8/13/20098/13/20098/13/2009 1:00:11 PMADONE
Required the construction company to apply for another ESC permit due to the slope grading that occured at the north end of project. Area is on another parcel of land. They were allowed to to slope grade the area per the BOI. Will re-inspect on 8/14/09 PM.
ESC08-00407 Site Preparation8/12/20098/13/20098/13/2009 8:43:41 AMADONE
Went over plan with RP prior to the start of any activity on site. Will re-inspect one all bmp's are implimented.