Inspections for the day of: Friday, August 13, 2010.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS10-00226 FIR-Final8/13/20108/13/20108/13/2010 2:59:51 PMPFAIL
Jim Sly and myself met the owner on site and the owner stated that he was in the process of involving an architect. I asked him to keep me informed of status and that I would stop by next week.
FIR10-00342 INSP-Sprinkler Rough-in/Hydro8/12/20108/13/20108/13/2010 2:26:23 PMPPART
A partial rough-in was performed. The riser has not been built and arm overs/drops have not been installed yet. Pipe routing has been changed in the remote areas but after confering with Tim Frost resubmittals will not be required. See the city approved plans for locations of deficiencies as marked in red.
FIR10-00342 INSP-Supply line flush8/12/20108/13/20108/13/2010 2:24:30 PMPCANC
Water has not been turned on to site yet so no flush was performed.
BLD10-01465 FIRE-Final Inspection8/11/20108/13/20108/13/2010 9:07:44 AMAPASS
Life safety passed.
FIR10-00371 INSP-Final Inspection8/13/20108/13/20108/13/2010 9:07:10 AMPPASS
Permit finaled
FIR10-00353 INSP-Final Inspection8/12/20108/13/20108/13/2010 9:04:24 AMAPASS
Permit finaled
FIR10-00342 INSP-Sprinkler Rough-in8/12/20108/13/20108/12/2010 2:02:03 PMPCANC
Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche