BLD13-01714
| FIRE-Sprinkler Rough-in | 8/13/2013 | 8/13/2013 | 8/13/2013 5:16:29 PM | P | PART |
|
|
Overhead fire sprinkler work approved for cover.
|
FIR13-00300
| INSP-Final Inspection | 8/13/2013 | 8/13/2013 | 8/13/2013 5:15:18 PM | A | PASS |
|
|
Fire sprinkler permit approved for final.
|
FIR13-00264
| INSP-Sprinkler Rough-in | 8/12/2013 | 8/13/2013 | 8/13/2013 5:11:51 PM | A | PART |
|
|
Completed overhead rough-in of the new wet and dry systems. Noted one missing EQ brace at the lower level 4" main, provide seismic clearance at the main through masonry wall west end. Additional uprights and branchline to be shown on record drawings. Non-sprinklered combustible concealed pockets to be filled with insulation as discussed with contractor to meet the allowable exceptions per NFPA. Discussed hydro and air testing, riser room yet to be built, FDC location, etc.
|