Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00316 INSP-Sprinkler Rough-in/Hydro8/13/20138/13/20138/13/2013 3:45:10 PMPPASS
Under ground hydro test passed.
FIR13-00380 INSP-Sprinkler Rough-in8/13/20138/13/20138/13/2013 3:28:46 PMPPART
Per the plans the wall separating the stock room from the retail area is full height but in reality it does not. So the three upright sprinkler heads located at the wall will require additional coverage over the ceiling of the retail area. All other work looked ok. Piping is ok to cover as long as access is provided to verify correction.
FIR13-00184 INSP-Sprinkler Rough-in/Hydro8/7/20138/13/20138/13/2013 3:21:57 PMAPASS
It took two inspections but the overhead hydro passed.
FIR13-00333 INSP-Sprinkler Rough-in8/12/20138/13/20138/13/2013 1:58:57 PMPFAIL
Pendant heads missing in the restroom closet and corridor between the restrooms. Heads are overspaced in the Storage room and in one area in the Sales area. Ceiling is ok to install in the Sales area.
FIR13-00405 INSP-Final Inspection8/13/20138/13/20138/13/2013 1:57:08 PMPCANC
Reschedule for tomorrow morning
FIR13-00406 INSP-Final Inspection8/13/20138/13/20138/13/2013 1:56:18 PMPCANC
Reschedule for tomorrow morning.
BLD13-01125 FIRE-Final Inspection8/12/20138/13/20138/13/2013 9:26:28 AMAPASS
life safety passed
BLD13-02178 FIRE-Final Inspection8/12/20138/13/20138/12/2013 2:34:46 PMAPART
Life safety passed for the office area only based on the currently provided information/plan review.