FIR13-00316
| INSP-Sprinkler Rough-in/Hydro | 8/13/2013 | 8/13/2013 | 8/13/2013 3:45:10 PM | P | PASS |
|
|
Under ground hydro test passed.
|
FIR13-00380
| INSP-Sprinkler Rough-in | 8/13/2013 | 8/13/2013 | 8/13/2013 3:28:46 PM | P | PART |
|
|
Per the plans the wall separating the stock room from the retail area is full height but in reality it does not. So the three upright sprinkler heads located at the wall will require additional coverage over the ceiling of the retail area. All other work looked ok. Piping is ok to cover as long as access is provided to verify correction.
|
FIR13-00184
| INSP-Sprinkler Rough-in/Hydro | 8/7/2013 | 8/13/2013 | 8/13/2013 3:21:57 PM | A | PASS |
|
|
It took two inspections but the overhead hydro passed.
|
FIR13-00333
| INSP-Sprinkler Rough-in | 8/12/2013 | 8/13/2013 | 8/13/2013 1:58:57 PM | P | FAIL |
|
|
Pendant heads missing in the restroom closet and corridor between the restrooms. Heads are overspaced in the Storage room and in one area in the Sales area. Ceiling is ok to install in the Sales area.
|
FIR13-00405
| INSP-Final Inspection | 8/13/2013 | 8/13/2013 | 8/13/2013 1:57:08 PM | P | CANC |
|
|
Reschedule for tomorrow morning
|
FIR13-00406
| INSP-Final Inspection | 8/13/2013 | 8/13/2013 | 8/13/2013 1:56:18 PM | P | CANC |
|
|
Reschedule for tomorrow morning.
|
BLD13-01125
| FIRE-Final Inspection | 8/12/2013 | 8/13/2013 | 8/13/2013 9:26:28 AM | A | PASS |
|
|
life safety passed
|
BLD13-02178
| FIRE-Final Inspection | 8/12/2013 | 8/13/2013 | 8/12/2013 2:34:46 PM | A | PART |
|
|
Life safety passed for the office area only based on the currently provided information/plan review.
|