FIR14-00277
| INSP-Supply line flush | 8/13/2014 | 8/13/2014 | 8/13/2014 4:50:02 PM | P | PART |
|
|
UG fire supply line and remote FDC flush completed.
|
BLD14-00769
| FIRE-Final Inspection | 8/13/2014 | 8/13/2014 | 8/13/2014 4:49:04 PM | P | NR |
|
|
Project related fire sprinkler work is not yet finished.
|
BLD14-02122
| FIRE-Conference | 8/13/2014 | 8/13/2014 | 8/13/2014 3:27:23 PM | P | DONE |
|
|
On site conference regarding fire code review note items including door hardware, smoke detection, existing fire alarm system and modifications to be included, IFC and BMC conditions.
|
BLD14-01470
| FIRE-Final Inspection | 8/13/2014 | 8/13/2014 | 8/13/2014 3:24:53 PM | P | PASS |
|
|
Life safety passed.
|
BLD14-00925
| FIRE-Final Inspection | 8/12/2014 | 8/13/2014 | 8/13/2014 12:57:02 PM | A | PART |
|
|
Walkthrough to verify fire sprinkler coverage prior to ceiling cover, discussed project scope, trade permits, and schedule.
|
FIR13-00723
| INSP-Sprinkler Rough-in | 8/12/2014 | 8/13/2014 | 8/13/2014 11:42:39 AM | A | PART |
|
|
Fire sprinkler work above grid ceilings on the second and first floors okayed for cover at locations initialed and dated on approved plans. Discussed schedule for hydrostatic testing.
|
FIR14-00284
| INSP-Final Inspection | 8/12/2014 | 8/13/2014 | 8/13/2014 11:07:23 AM | A | PASS |
|
|
Verified correct temp heads in the mechanical closets.
|
FIR13-00697
| INSP-Sprinkler Rough-in | 8/12/2014 | 8/13/2014 | 8/13/2014 10:47:43 AM | A | PART |
|
|
Overhead fire sprinkler work at the mens locker, shower and restrooms C100 and C101 are approved for ceiling cover.- ref. dated annotations on stamped plan set.
|