BLD05-01282
| BLD-Aging Inspection | 8/13/2014 | 8/13/2014 | 8/14/2014 12:55:38 PM | | PEND |
|
|
Still pending fire.
|
BLD13-03318
| BLD-Wall Bracing | 8/13/2014 | 8/13/2014 | 8/13/2014 3:44:43 PM | P | PART |
|
|
Plans are in the green box across the parking lot outside the building. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler. Provide staple conversion, install floor to floor straps.
|
BLD14-02183
| BLD-Final | 8/13/2014 | 8/13/2014 | 8/13/2014 3:16:56 PM | P | DONE |
|
|
Richard Phone #: ###-####
|
BLD14-02183
| DOC - Permit Finaled | 8/13/2014 | 8/13/2014 | 8/13/2014 3:16:42 PM | P | PASS |
|
|
All work appearred to be done in accordance with local codes ordinances.
|
BLD13-03318
| BLD-Conference | 8/13/2014 | 8/13/2014 | 8/13/2014 3:15:30 PM | P | PASS |
|
|
Upstairs common wall insulation inspection. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD14-00190
| BLD-Final | 8/13/2014 | 8/13/2014 | 8/13/2014 2:36:25 PM | P | CANC |
|
|
phil Phone #: ###-####. posiible wrong permit called in. called phil at above number and left message.
|
ESC14-00352
| Site Final | 8/13/2014 | 8/13/2014 | 8/13/2014 2:13:53 PM | P | DONE |
|
|
|
ESC14-00352
| DOC - Permit Finaled | 8/13/2014 | 8/13/2014 | 8/13/2014 2:13:41 PM | P | PASS |
|
|
|
BLD14-00951
| BLD-Final | 8/12/2014 | 8/13/2014 | 8/13/2014 2:13:04 PM | P | PASS |
|
|
Dennis Phone #: ###-####
|
BLD14-00951
| DOC - Permit Finaled | 8/13/2014 | 8/13/2014 | 8/13/2014 2:13:03 PM | P | PASS |
|
|
|
BLD14-01103
| BLD-Energy code compliance | 8/13/2014 | 8/13/2014 | 8/13/2014 1:47:33 PM | A | PASS |
|
|
###-#### Ashley. Rigid insulation at stemwall under slab on grade.
|
BLD14-01105
| BLD-Energy code compliance | 8/13/2014 | 8/13/2014 | 8/13/2014 1:47:14 PM | A | PASS |
|
|
###-#### Ashley. Rigid insulation at stemwall under slab on grade.
|
BLD14-01237
| BLD-Other | 8/13/2014 | 8/13/2014 | 8/13/2014 1:30:00 PM | P | PASS |
|
|
pat Phone #: ###-####
|
BLD14-00451
| BLD-Final | 8/13/2014 | 8/13/2014 | 8/13/2014 1:23:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD14-00451
| DOC - Permit Finaled | 8/13/2014 | 8/13/2014 | 8/13/2014 1:23:39 PM | P | PASS |
|
|
|
BLD14-00451
| BLD-Blower Door Test Results | 8/13/2014 | 8/13/2014 | 8/13/2014 1:23:31 PM | P | DONE |
|
|
4.4
|
BLD14-00215
| BLD-Wall Bracing | 8/12/2014 | 8/13/2014 | 8/13/2014 11:23:25 AM | A | FAIL |
|
|
Richard Phone #: ###-####. 2 floor t floor straps installed in wrong location.
|
BLD14-00205
| BLD-Wall Bracing | 8/12/2014 | 8/13/2014 | 8/13/2014 11:21:59 AM | A | PASS |
|
|
richard Phone #: ###-####. Exterior floor to floor straps ok.
|
BLD14-00206
| BLD-Wall Bracing | 8/12/2014 | 8/13/2014 | 8/13/2014 11:21:00 AM | A | PASS |
|
|
richard Phone #: ###-####. Exterior floor to floor straps ok.
|
ESC14-00702
| Site Preparation | 8/13/2014 | 8/13/2014 | 8/13/2014 10:30:45 AM | A | PART |
|
|
All hard surfaces have been sweeped.
|
ESC14-00701
| Site Preparation | 8/13/2014 | 8/13/2014 | 8/13/2014 10:30:27 AM | A | PART |
|
|
All hard surfaces have been sweeped.
|
ESC14-00699
| Site Preparation | 8/13/2014 | 8/13/2014 | 8/13/2014 10:30:10 AM | A | PART |
|
|
All hard surfaces have been sweeped.
|
BLD14-02139
| BLD-Foundation | 8/12/2014 | 8/13/2014 | 8/13/2014 10:28:58 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD14-02137
| BLD-Foundation | 8/12/2014 | 8/13/2014 | 8/13/2014 10:28:44 AM | A | PASS |
|
|
Prior to 11:00am Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD14-02141
| BLD-Foundation | 8/12/2014 | 8/13/2014 | 8/13/2014 10:28:24 AM | A | PASS |
|
|
Prior to 11:00 Phone #: ###-#### Inspection requested via web by Andy Thompson
|
ESC14-00140
| Site Final | 8/13/2014 | 8/13/2014 | 8/13/2014 10:26:53 AM | A | DONE |
|
|
|
ESC14-00140
| DOC - Permit Finaled | 8/13/2014 | 8/13/2014 | 8/13/2014 10:26:43 AM | P | PASS |
|
|
|
BLD14-00451
| BLD-Final | 8/12/2014 | 8/13/2014 | 8/13/2014 10:26:29 AM | A | FAIL |
|
|
Andy Phone #: ###-####. Provide the required energy cert and post. Also provide either the 3rd party airseal inspection report or the blower door test result and post.
|
BLD13-03538
| BLD-Energy code compliance | 8/8/2014 | 8/13/2014 | 8/13/2014 9:54:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03539
| BLD-Energy code compliance | 8/8/2014 | 8/13/2014 | 8/13/2014 9:53:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD14-01103
| BLD-Energy code compliance | 8/12/2014 | 8/13/2014 | 8/13/2014 9:30:41 AM | A | FAIL |
|
|
ashley Phone #: ###-####. Remove all debries from building footprint. Rigid insulation to be attached in approved manner.
|
BLD14-01105
| BLD-Energy code compliance | 8/12/2014 | 8/13/2014 | 8/13/2014 9:30:19 AM | A | FAIL |
|
|
ashley Phone #: ###-####. Remove all debries from building footprint. Rigid insulation to be attached in approved manner.
|
BLD14-00819
| BLD-Conference | 8/12/2014 | 8/13/2014 | 8/13/2014 9:22:11 AM | A | CANC |
|
|
Requesting a 3rd story shear wall inspection as soon as you can AM Wednesday August 13th. Inspector requested to see walls before they are stood. Thank you. Phone #: ###-#### Inspection requested via web by David Moorhouse
|
BLD14-00819
| BLD-Wall Bracing | 8/13/2014 | 8/13/2014 | 8/13/2014 9:21:58 AM | A | PASS |
|
|
Requesting a 3rd story shear wall inspection as soon as you can AM Wednesday August 13th. Inspector requested to see walls before they are stood. Thank you. Phone #: ###-#### . Inspection requested via web by DavidMoorhouse. 3rd floor exterior shear walls ok.
|
BLD14-02295
| BLD-Footing | 8/12/2014 | 8/13/2014 | 8/13/2014 8:56:42 AM | A | PASS |
|
|
|